My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
failing on-site system
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
3507 Wayzata Blvd W - 32-118-23-13-0001
>
Permits/Inspections
>
failing on-site system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:15 PM
Creation date
2/10/2020 12:38:51 PM
Metadata
Fields
Template:
x Address Old
House Number
3507
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
3507 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3211823130001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> CITY of ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> 9kESII0 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> December 14, 1993 <br /> Mr. D. Brian Fulmer <br /> 3507 Wayzata Boulevard <br /> Long Lake, MN 55356 <br /> Dear Mr. Fulmer: <br /> Due to a failing septic system at your dog kennel facility, the City Council on December 8, 1986 <br /> granted a variance for you to hook up to the sewer line located at the southeast corner of US <br /> Highway 12 and the Burlington Northern Railroad pending Metropolitan Council approval. The <br /> City acquired the Met Council's approval in 1987, but the sewer hook up has still not been <br /> completed after six years. <br /> The septic system has been discharging sewage effluent to the surface posing a threat to the <br /> health and welfare of the residents of the City. The sewer hook up is required now to eliminate <br /> the sewage discharge before any serious health problems result. <br /> Engineering was approved for your lift station and connection to the sewer line October 13, <br /> 1993. You have been contacted on several occasions to verify your progress in making the <br /> connection to the sewer line. At this time, connection has not been made nor has a permit been <br /> issued for the required work. In order to expedite your connection to the sewer and <br /> abandonment of your septic system, you are required to obtain a permit for connection to sewer <br /> by January 5, 1994 with the sewer connection and septic system abandonment to be completed <br /> by January 31, 1994. If these deadlines are not met, we will be forced to turn this matter over <br /> to the City Attorney. <br /> Please contact me at the City offices if there are any questions. Thank you for your <br /> cooperation. <br /> Sincerely, <br /> Step en Weckman <br /> On-Site Systems Manager <br /> SW/lsv <br /> Telephone (612) 473-7357 9 FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.