My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Follow-up letter regarding preliminary volume review for SAC
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2687 Wayzata Boulevard West - 33-118-23-13-0002
>
Correspondence
>
Follow-up letter regarding preliminary volume review for SAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:15 PM
Creation date
2/10/2020 10:55:30 AM
Metadata
Fields
Template:
x Address Old
House Number
2687
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2687 Wayzata Boulevard West
Document Type
Correspondence
PIN
3311823130002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Metropolitan Council <br /> Environmental Services <br /> Guideline for SAC Volume Study <br /> Contact the engineer in charge of your permit before commencingwith <br /> volume study option. Special conditions, other than those specified in this <br /> to your facility. h the wastewater <br /> guideline, may apply <br /> - The wastewater volume study shall consist of a minimum of 30 continuo <br /> data acquired from the use of incoming water meter(s) and/or from a <br /> us days of volume <br /> measuring device. wastewater effluent flow <br /> - Deduct meters shall also be used when losses to lawn sprinkling, evaporation, <br /> etc., exist at the facility. If these losses cannot be accounted for by meter, e <br /> submit to the MCES engineering calculations estimating these to product loss, <br /> flow measuring from an MCES approved monitoring site. he Permittee shall <br /> sses and/or conduct effluent <br /> g <br /> - All values used to determine the actual or calculated daily wastewater fl <br /> be submitted for each day of the study. <br /> facility during the stud Y Also, indicate the daily activity taking placeow at the <br /> Y(e.g. full operation, cooling water clean up). <br /> - Please account for any unusual events, such as a spill, that may have occurred during the <br /> volume study time frame. <br /> The results of this study shall be submitted to the MCES byM arch 31 2 <br /> calculate a SAC equivalent based on an average of the 5 highest dail y w000. MCES staff will <br /> MCES reserves the right to conduct additional volume monitorin if deemed <br /> flows. The <br /> Monitoring ed necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.