Laserfiche WebLink
Fees to be Charged YES. . NO . <br /> Permit • t • <br /> Plan Review tV. <br /> State Surcharge f✓' <br /> Investigation Fee q/' <br /> SAC Number of SAC Units <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement, • . X • _. . $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ ,No <br /> • <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing D Site D Plumbing O Grading/Filling <br /> D Poured Wall 0 Silt Fence/Erosion Control Mechanical 0 Fire <br /> )5 .,Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> O Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> O Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> 0 Insulation <br /> O As-Built Survey <br /> Final <br /> O Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> • 0 See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />