My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 4529
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
1181 Wildhurst Tr - no PID
>
Resolutions
>
Res 4529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:52 AM
Creation date
2/7/2020 11:12:33 AM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i- <br /> i <br /> O <br /> O <br /> CITY of ORONO <br /> '045111 G RESOLUTION OF THE CITY COUNCIL <br /> \ ESH� N0. 13t ` <br /> • <br /> defined front yard. Lot 2 has a defined width of 110' and Lot 3 has a defined <br /> width of 126'. However, the granting of a lot width variance for these lots is <br /> justified by the fact that each of Lots 2 and 3 contains a suitable building site <br /> meeting all required lot line setbacks without the need for further variances. <br /> 4. Lots 2 and 3 are 'through' lots subject to a conditional use permit requirement <br /> for placement of any accessory structures. <br /> 5. Each of these three Lots contains sufficient width and building envelope to <br /> accommodate a single family residence. <br /> 6. The property contains areas with greater than 12% slopes which are defined as <br /> "steep slopes" by the Code. Section 10.56, Subdivision 16 (G) requires permit <br /> requests for development of properties within the Shoreland Overlay District and <br /> on steep slopes to include adequate information to allow the City to evaluate <br /> possible soil erosion impacts before the permit can be issued. The subdivider <br /> has provided a grading and drainage plan that addresses the issues. <br /> 7. The subdivider has proposed a stormwater management plan which will include <br /> stormwater ponding, storm sewers where appropriate, and vegetated buffer areas, <br /> to provide for stormwater quality and quantity management. The outlets from <br /> the ponds would control the rate the stormwater would exit the ponds. <br /> 8. Lots 2 and 3 will require a drainage swale to redirect water runoff to the pond <br /> on Lot 1. The portions of the Lots below the 1014' contour will be protected <br /> by a conservation easement. The conservation easement would protect the <br /> natural grades and vegetation on the slope. <br /> 9. Drainage Easements will be dedicated on the final plat for the ponds, ravines <br /> and swale. <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.