Laserfiche WebLink
B R A I I N' Braun Intertec Corporation <br /> 6801 Washington Avenue South <br /> N T E RT E C Minneapolis,Minnesota 55439 <br /> 612-941-5600 Fax:941-4151 <br /> Engineers and Scientists Serving <br /> the Built and Natural Environment? <br /> A. Introduction <br /> A.1. Project <br /> We understand that a single-family residence is planned for 1080 Wildhurst Trail in Orono, Minnesota. <br /> A single-family residence is also planned on the neighboring lot at 1074 Wildhurst Trail. Two <br /> standard penetration soil test borings were performed at 1074 Wildhurst Trail and at 1080 Wildhurst <br /> Trail. <br /> A.2. Purpose <br /> The purpose of the soil borings was to evaluate the subsurface soil and groundwater conditions at this <br /> site in the area of the new residential construction. The information will be used by you and your <br /> design team to prepare plans and specifications for the new house. <br /> A.3. Scope <br /> Our geotechnical evaluation was performed in general accordance with our Authorization for Services <br /> you signed. <br /> Our scope of services consisted of the following: <br /> • Staking the boring locations and determining ground surface elevations at the boring <br /> locations; <br /> • coordinating the locating of underground utilities near the boring locations; <br /> • conducting two penetration test borings to nominal depths of 40 to 60 feet; <br /> • classifying the samples and preparing boring logs; <br /> • formulating recommendations for driven piling foundations: and <br /> • submitting a geotechnical evaluation report containing logs of the borings, our analysis of <br /> the field tests, and recommendations for driven pile foundations. <br /> A.4. Information Provided <br /> You provided us with a"Lot Survey' including elevations of sanitary manhole covers located just <br /> north of the north lot line. The survey shows lot lines. a proposed building footprint, proposed <br /> driveway, and existing garage. <br />