My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 Geotechnical Evaluation Report
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
1080 Wildhurst Trail - 07-117-23-24-0011
>
Land Use
>
2001 Geotechnical Evaluation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:32:51 PM
Creation date
2/6/2020 1:29:24 PM
Metadata
Fields
Template:
x Address Old
House Number
1080
Street Name
Wildhurst
Street Type
Trail
Address
1080 Wildhurst Tr
Document Type
Land Use
PIN
0711723240011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RVC Homes <br /> Project BABX-01-0124 <br /> April 12, 2001 <br /> Page 12 <br /> between these borings, the nature and extent of which do not become evident until additional <br /> exploration or construction is conducted. A reevaluation of the recommendations in this report should <br /> be made after performing on-site observations during construction to note the characteristics of any <br /> variations. The variations may result in additional grading or foundation costs, and it is suggested that <br /> a contingency be provided for this purpose. <br /> It is recommended that we be retained to perform the observation and testing program for the site <br /> preparation phase of this project. This will allow correlation of the soil conditions encountered during <br /> construction to the soil borings, and will provide continuity of professional responsibility. <br /> F.2. Review of Design <br /> This report is based on the design of the proposed house as related to us for preparation of this report. <br /> It is recommended that we be retained to review the geotechnical aspects of the designs and <br /> specifications. With the review, we will evaluate whether any changes in design have affected the <br /> validity of the recommendations, and whether our recommendations have been correctly interpreted and <br /> implemented in the design and specifications. <br /> F.3. Groundwater Fluctuations <br /> We made water level observations in the borings at the times and under the conditions stated on the <br /> boring logs. These data were interpreted in the text of this report. The period of observation was <br /> relatively short, and fluctuations in the groundwater level may occur due to rainfall, flooding, <br /> irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time the <br /> observations were made. Design drawings and specifications and construction planning should <br /> recognize the possibility of fluctuations. <br /> F.4. Use of Report <br /> This report is for the exclusive use of RVC Homes to use to design the proposed house and prepare <br /> construction documents. In the absence of our written approval, we make no representation and <br /> assume no responsibility to other parties regarding this report. The data, analyses and <br /> recommendations may not be appropriate for other structures or purposes. We recommend that parties <br /> contemplating other structures or purposes contact us. <br />
The URL can be used to link to this page
Your browser does not support the video tag.