My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 - P04726 - new structure
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
1074 Wildhurst Tr - 07-117-23-24-0046
>
Permits/Inspections
>
2002 - P04726 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:15 PM
Creation date
2/6/2020 11:11:27 AM
Metadata
Fields
Template:
x Address Old
House Number
1074
Street Name
Wildhurst
Street Type
Trail
Address
1074 Wildhurst Tr
Document Type
Permits/Inspections
PIN
0711723240046
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Milrlehaha Creek Watershed District <br /> Improving Quality of Water, Quality ofLife <br /> Gray Freshwater Center <br /> Hwys.15&19,Navarre MEMORANDUM <br /> DATE: March 2, 2000 <br /> Mail: <br /> 2500 Shadywood Road TO: Area Builders, Contra tors, and Potential Permit Applicants <br /> Excelsior,MN 55331-9578 FROM: Barbara Moeller <br /> Phone: (952)471-0590 <br /> Fax: (952)471-0682 RE: MCWD Rule Requirements and Permit Applicability <br /> Email: Projects requiring a permit from municipalities and townships may also <br /> require a permit from the Minnehaha Creek Watershed District (MCWD). <br /> admin@minnehahacreek.org Some projects that do not require a city permit may require a MCWD permit. <br /> Web site: Please consult the following list to see if your project requires a MCWD <br /> permit. Call the MCWD office if you have any questions. <br /> www.minnehahacreek.org <br /> Erosion Control: <br /> • Grading of 5,000 square feet or more <br /> • Stockpiling or excavation of more than 50 cubic yards of material <br /> • As of January 1, 2000 MWD requires that all silt fence installed <br /> Board of Managers be orange in color. <br /> FamelaG.Blixt Floodplain Alteration: <br /> James Calkins • Any activity that proposes to place fill of any type in a floodplain <br /> Lance Fisher associated with a lake, river, stream, wetland, or any other water <br /> basin. <br /> Monica Gross <br /> Thomas W.LaBounty Wetland Protection: <br /> scottTnomas • All projects associated with the draining, filling, or excavation of a <br /> wetland <br /> Malcolm Reid <br /> Dredging: <br /> • All dredging in the beds, banks, or shores of any protected water <br /> or wetland <br /> Shoreline and Streambank Improvement: <br /> • All shoreline and stream'- ink improvements, including but not <br /> limited to rip rap, retaining walls, sheet piling, and boat ramps <br /> • All sandblanket projects <br /> 29 <br /> ®Printed one recyced paper antaining <br /> at least 30.post consumer waste. <br />
The URL can be used to link to this page
Your browser does not support the video tag.