My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017 - 00296 - land alteration
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
1006 Wildhurst Tr - 07-117-23-24-0045
>
Permits/Inspections
>
2017 - 00296 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:13 PM
Creation date
2/6/2020 9:42:23 AM
Metadata
Fields
Template:
x Address Old
House Number
1006
Street Name
Wildhurst
Street Type
Trail
Address
1006 Wildhurst Tr
Document Type
Permits/Inspections
PIN
0711723240045
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dok <br /> ' City of Orono <br /> Zoning Permit Application ,q� <br /> O Mailing Address: Permit number: �D 17-- 4/v? <br /> PO Box 66 <br /> Crystal Bay, MN 55323-0066 Date received: 3-36-1 <br /> Escrow#and ) 2 �l �ygrr� <br /> Street Address: �, amount: AO/7-0-03[ Cj -' lil°3 c.t O <br /> AT <br /> 2750 Kelley Parkwa L <br /> A <br /> Orono, MN 55356 Permit Fee: <br /> F G <br /> el 1 �y� Approved by: <br /> kESHO� Fax: 952-249-461 �,,,, <br /> Main: 952-249-46001" Notes: <br /> www.ci.orono.mn.us <br /> This application form must be completed in full and all required information must be submitted. (Please print.) <br /> Job Site Address: j 9 ob U" /L-pSU f s 7- TI1 A'l/s- <br /> CONTRACTOR/APPLICANT INFORMATION: <br /> Name: -... CV (1(a/EW , �1c�1.S <br /> Phone: ;o 7 2O- , .. o4(__,0 Fax: 6,1,S7 i-7t 65- /73 4 <br /> Address: 23 ir3 x'11,0 ( KM 0, 1rj -City: 3f rfi�dJL ZIP: JS/20 <br /> Contact Person: K,,L�}Z,�j - 1 IA,0 a(J Contact's phone (29/.7, 23.. 11 '• <br /> Email 10-1,fi(00 (14;7 404e,x4'J,i . Via^ Applicant is: ontractor Homeowner (Circle One) <br /> PROPERTY OWNER INFORMATION: ) <br /> Name: AJ- Pv til M 1-714- 1111 6_P'K-l—E f2 <br /> Phone(day): CeiS2) I-1-17- - 31- 39 <br /> Mailing Address: ICC(o I,t.2 1 LD - LIQ 1- i (L 1 Pi D V 1.3 17 ZIP: 5 S :2)64 <br /> Email and/or Fax OtinLuy\GtOriccAN.,cVti , Ct yvl <br /> Overall Project Description: j/ ('ALL1A > J>.N. 1 Iv( <br /> CheckBoXFEE <br /> TYPE OF PERMIT collected when permit is issued <br /> Dock,Commercial $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Dock, Residential - Permanent dock on any lake or initial seasonal dock not on Lake $50+engineering review costs <br /> Minnetonka(permanent dock requires CUP) -- <br /> VHardcover Permit: Driveway, Patio,Sidewalk,etc.(New or Replacement) /( No charge/ <br /> Also requires is a Minor or Major Land Alteration Permit <br /> Land Alteration,Major(grading,filling,or excavating)of more than 500 cubic yards beyond $50 <br /> the lakeshore setback OR more than 50 cubic yards within the lakeshore setback (also <br /> requires Conditional Use Permit) <br /> (Reference: City Code Sections 78-967,78-1247 and 78-12861 <br /> Escrow for erosion control and engineering review costs ,,.,:...As determined by CUP <br /> and Alteration, Minor(grading,filling or excavating)of 51 to 500 cubic yards beyond`fhe $50+engineering review costs <br /> lakeshore setback OR 50 cubic yards or less within the lakeshore setback <br /> (Reference: City Code Sections 78-967.78-1247 and 78-12861 <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Retaining Walls which exceed two feet in height above existing grade; or result in more $50+engineering review costs <br /> than 20 cubic yards of imported fill;or are located less than five feet from the property line. <br /> Escrow for erosion control and engineering review costs $2,500 <br /> (Reference: City Code Section 78-1405(5.1)1 <br /> Retaining Walls which measure more than four feet(from bottom of footings to top of wall) <br /> require a building permit.Tiered retaining walls are considered one wall unless the walls are <br /> separated by twice the height of the lower wall. <br /> Stairway or Lifts to Lake(New or Replacement) (Reference: City Code Sections 78-12821 $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Structure Permit for other structures 200 sf or less not requiring a building permit but $50+engineering review costs <br /> regulated by the zoning code(Reference: City Code Section 86-661 <br /> Escrow for erosion control and engineering review costs $2,500 <br /> Tree Removal or other vegetation removal within 75 feet of lakes No charge. <br /> (Reference: City Code Section 78-12851 RECEIVEgispection required. <br /> Temporary Construction Office/Trailer(associated with building permit) $30 <br /> MAR 3 0 2017 <br /> Updated: January 2017 <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.