Laserfiche WebLink
1006 Wildhurst <br /> SCOPE OF WORK <br /> Exterior: <br /> • Remove stucco, wire mesh and tar paper <br /> • Pull all staples <br /> • Remove cedar trim around doors windows and rim <br /> • Leave dormer and gable end treatment in tact <br /> • Access water damage and leakage <br /> • Replace OSB if necessary <br /> • Inspect insulation and replace if necessary <br /> • Flash, caulk and weather seal windows with ice and water shield <br /> • Replace cedar trim around windows <br /> • Wrap window, door, corners and rim with aluminum <br /> • Wrap fascia with aluminum <br /> • Side with"James Hardie"schake siding <br /> • Install rain diverters where siding meets rock or Fascia <br /> • Install proper flashing arched window above deck <br /> • Remove planters, flash, caulk and reinstall <br /> • <br /> 15 A. cc-;— 3C); 000_ oa <br /> Interior <br /> • Remove all base trim <br /> • Remove vanities and flooring <br /> • Hang furnace and secure all mechanical <br /> • Remove exciting air exchanger <br /> • Remove exciting plywood and flooring <br /> • Cut TGI's and remove <br /> • Remove crawl space vapor barrio <br /> • Confirm sill plate to be green treated or equivalent, replace if necessary <br /> • Drain tile interior perimeter <br /> • Day light drain tile to exterior for proper drainage <br /> • Place drainage rock next to drain tile to within four inches of new floor <br /> • File remainder of basement with sand within ten inches of exciting floor <br /> • Fill remainder six inches with rock <br /> • Silk fence were needed to separate rock and sand <br /> • Pour 4"of concrete, trowel and finish <br /> • Replace trim, vanity, ceramic and carpet <br /> �s7-- cess 1 S/ 6EO: e-)c7 <br />