Laserfiche WebLink
Bonestroo <br /> Bonestroo,Rosene,Anderlik and Associates,Inc.is an Affirmative ActioniEqual Opportunity Employer <br /> Principals::Otto G. Bonestroo,P.E.•Joseph C.Anderlik,P.E.• Marvin L.Sorvala,P.E.• <br /> Richard E.Turner, P.E.• Glenn R.Cook,P.E.•Robert G.Schunicht,P.E.• Jerry A.Bourdon,P.E.• <br /> RoseneRobert W.Rosene, P.E.and Susan M.Eberlin,C.P.A.,Senior Consultants <br /> Associate Principals:Howard A.Sanford,P.E.• Keith A.Gordon,P.E.•Robert R.Pfefferle,RE.• <br /> Anderlik & <br /> Richard W.Foster, RE.• David O.Loskota,RE.•Robert C.Russek,A.I.A.• Mark A.Hanson,P.E.• <br /> Michael T.Rautmann,P.E.• Ted K.Field,P.E.• Kenneth P.Anderson,P.E.• Mark R.Rolfs,PE.• <br /> 11 Associates Sidney P Williamson,RE.,L.S.• Robert F.Kotsmith <br /> Offices:St.Paul,Rochester,Willmar and St.Cloud,MN• Milwaukee,WI <br /> Engineers &Architects <br /> September 8, 1997 <br /> • <br /> Mr.Michael P.Gaffron <br /> Assistant Building and Zoning Administrator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay,Minnesota 55323 <br /> Re: Wildhurst Trail Site Plat <br /> File No. 139-2293 <br /> Dear Mike, <br /> We have reviewed the preliminary plat prepared for LGA Investment Group on the proposed Wildhurst Trail Site, a <br /> fourteen lot(and two outlots)subdivision of PID Numbers 07-117-23-22-0008,07-117-23-22-0007,07-117-23-22-0017 <br /> and 07-117-23-21-0002, located south of County Road 151 in the northwest quarter of Section 7. There are several <br /> issues that need to be addressed relative to engineering matters and included with the plan. <br /> 1. Utilities: The proposed sanitary sewer design appears acceptable from an engineering standpoint. Final plans <br /> should show service locations and elevations. Part of the area to be served is outside the current MUSA boundary. <br /> 2. Streets: We usually discourage islands in cul-de-sacs. A minimum of a 45-foot radius to the face of curb and 110 <br /> feet of right-of-way should be provided if islands are used. Final plans should include a typical street section based <br /> on a geotechnical analysis of the site. The driveway for Lot 11 is shown on the shared driveway for Lots 9 and 10. <br /> The City Code allows only two units on a shared driveway. <br /> 3. Grading:The proposed grading plan appears acceptable. Due to the steep topography grading plans for individual <br /> lots should be prepared prior to issuance of building permits. Where will the driveway be located for Lot 1? There <br /> should be some discussion regarding future plans for and proposed access to Outlots A and B. <br /> 4. Drainage: Storm sewer design should include provisions for controlling runoff at the south end of the site on <br /> Wildhurst Trail. Final plans should be submitted to the Minnesota DNR and Minnehaha Creek Watershed District <br /> for their review and approval. Storm sewer and ponding and calculations should be included with the final plans. <br /> The storm sewer should be designed to minimize velocities at the pond inlet. <br /> 5. Easements: Drainage easements should be provided across all drainage ways and ponding areas. Easements <br /> should be provided for any existing utilities within the areas to be vacated. <br /> 6. Financial Guarantee:We have attached an estimate of the total cost for the site improvements and the amount <br /> of the required financial guarantee. <br /> Please contact me at this office if you have any questions regarding this matter. <br /> Yours very truly, <br /> BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC. <br /> 11,40 <br /> Tom Kellogg <br /> Cc: Greg Gappa,City of Orono <br /> 2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 • Fax: 612-636-1311 <br />