Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS ' <br /> Address: Permit No.:�67Aq— 00 <br /> Description of work: -L�S��C V p^�� % Date Recd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: Z <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: S%' C Width: Lot Coverage: SF % <br /> Survey Submitted: 0 Yes 0 No Date of Survey: Revised date(?): <br /> Landscape plan submitted? 03\e s 0 No Landscaper: <br /> Proposed Setbacks: <br /> Front (Lake) Rear(Street) ( N S E W ) ( NXIE W ) Other Buildings Wetland <br /> Side e <br /> Defined Height: Peak Height: FF FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50%= L.F. below grade <br /> Basement? 0 Yes 0 No, �tories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPA FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance betweena lowest proposed Slab at or above grade— <br /> START WITH floor(of the baseme o rawl space)and measure from highest existing <br /> the highest point of a ro f. START WITHrp ade to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you haten <br /> SUBTRACTION • GHIPPED R OF(no Slab below grade—measure <br /> (BASED ON windSubtract half he distance from highest existing grade to the <br /> ROOF TYPE) bee highest poin of the roof hi hest oint of the roof. <br /> topoint of the corr sponding If you have a... <br /> gpped roof SUBTRACTION GABLE OR HIPPED ROOF <br /> • ABLE OR HIPPED ROOF with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the 'stance ROOF TYPE) the distance between the <br /> between the top of the highes highest point of the roof to <br /> window and the highest point o the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> 1 <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />