Laserfiche WebLink
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> 10 G1 NO. 6769 <br /> l�kEslio <br /> 4. In considering this Conditional Use Permit application,the Council has considered the advice and <br /> recommendation of the Planning Commission and the effect of the proposed variance upon the <br /> health, safety and welfare of the community, existing and anticipated traffic conditions, light and <br /> air, danger of fire,risk to the public safety, and the effect on values of property in the surrounding <br /> area. <br /> CONDITIONAL USE PERMIT ANALYSIS: <br /> The City Council may grant a CUP as the use permit was applied for or in modified form. On the basis of <br /> the application and the evidence submitted,the city finds that the proposed use at the Property is or will be: <br /> The Planning Commission may recommend and the Council may grant a Conditional Use Permit <br /> (CUP) as the use permit was applied for or in modified form.On the basis of the application and the <br /> evidence submitted,the city must fmd that the proposed use at the proposed location is or will be: <br /> 1) Consistent with the community management plan; The community management plan <br /> suggests industrial uses in this part of Orono. <br /> 2) Compliant with the zoning code,including any conditions imposed on specific uses as <br /> required by article V,division 3 of the City Code; "Trucking,but not distribution centers" <br /> is a listed conditional use in the Zoning Ordinance. The City Council feels the bus garage <br /> is appropriate use of land in the Industrial zoning district and consistent with the zoning <br /> code. <br /> 3) Adequately served by police,fire,roads,and stormwater management; The site is on a <br /> county road with capacity for the designed traffic. During peak hours,based on <br /> empirical experience,full maneuverability may be problematic,delaying left turns onto <br /> Wayzata Blvd. <br /> 4) Provided with an adequate water supply and sewage disposal system; The site is served by <br /> municipal water and sanitary sewer.Bus washing is mentioned in the write up,but not <br /> shown on the plan. If bus washing is to occur in a dedicated space,i.e. a wash-bay it <br /> should be shown on a site plan,and may impact effluent draining and applicable SAC <br /> units for the property. <br /> 5) Not expected to generate excessive demand for public services at public cost; The use is not <br /> expected to require additional policing,traffic control,or staffing from the city. <br /> 6) Compatible with the surrounding area as the area is used both presently and as it is planned to <br /> be used in the future; The neighborhood has been developed; the proposed use is not <br /> expected to impact adjacent uses.The surrounding properties are well maintained, <br /> present a professional appearance,and storage areas are screened from view. <br /> 7) Consistent with the character of the surrounding area,unless a change of character is called for <br /> in the community management plan; The Planning Commission should determine if a fuel <br /> island and exterior bus storage is consistent with the character of the neighborhood. <br /> 2 <br />