Laserfiche WebLink
Orono Building—Spensa Page 2 of 3 <br /> Response to Comments June 18,2009 <br /> Bonestroo: Draintile should be provided for the rain garden. <br /> AE: Updated plans and details to reflect 6"draintile in rain garden. <br /> Bonestroo: The applicable code section is 79-7(c)(2)for all commercial or industrial sites <br /> in which land disturbance activities fill or excavate more than 100 cubic yards. <br /> AE Plans and narratives were revised to meet code. <br /> Sonestroo: To bring this submittal in to compliance with the ordinance,the following <br /> information should be provided separately or on the grading plan. <br /> Phasing plan. A phasing plan shall be provided that clearly indicates the areas in <br /> the order they are to be disturbed and restored. The phasing plan shall consider <br /> minimization of area and duration of exposed soil and unstable conditions, <br /> minimization of the disturbance of natural soil cover and vegetation,erosion and <br /> sediment control measure installation,weather conditions and the schedule for <br /> temporary and permanent restoration.The area and duration of each phase shall <br /> be indicated on the plan. <br /> AE: Phasing plan sequencing has been added to the grading plan. <br /> Standard detail sheet. A standard detail sheet shall be provided that consists of <br /> applicable construction details for approved erosion and sediment control <br /> measures as developed by the City. Other techniques may be used upon prior <br /> approval by the City with details provided by the designer. <br /> AE: Standard details are shown on Grading/Site Plan and Erosion Control Plan. <br /> Specifications. Written specifications for land disturbance activities such as <br /> product descriptions, installation and maintenance procedures required by the <br /> applicant to carry out the project in accordance with this Chapter. <br /> AE: Written narrative is provided on Grading Plan via SWPPP Notes and Procedures. <br /> Temporary erosion and sediment control plan: Indicate the location of perimeter <br /> controls, construction fence,temporary sedimentation basins, inlet protection, <br /> areas to be seeded,areas to be mulched or blanketed, location of construction <br /> waste control (dumpsters,chemical storage,concrete washout, portable restroom <br /> facilities, etc.)and all other required temporary erosion and sediment control <br /> measures. This plan shall also indicate staging of temporary erosion control <br /> measures. <br /> AE: Added Temporary Erosion Control Plan. Narrative and notes dictate appropriate <br /> sequencing and staging for temporary erosion measures. <br /> ZADocs 11 500\1 1586 Orono Bldg-Spensa\Response to Comments 6-18-09.doc <br />