Laserfiche WebLink
ORONOCI3Y <br /> . <br /> CERTIFICATE OF SURVEY FOR <br /> THOMPSON CONTRACTING <br /> IN THE NW 1 /4, NE 1 /4, SECTION 7- 117 <br /> HENNEPIN COUNTY, MINNESOTA <br /> City of Orono Plan Rev^W. ik• �'� <br /> East 100.00 Planning (� <br /> Site Plan Review Date: <br /> TH REVISIONS(see notes) <br /> �FPROVED <br /> p APPROVED <br /> r� 4' p DENIED <br /> N <br /> M Staff <br /> Sta : <br /> in <br /> West line of NW 1/4, <br /> NE 1/4, Sec. 7-117-23 O <br /> 1 <br /> t <br /> co <br /> ROCK <br /> BORDER o <br /> A <br /> 700.00 <br /> o eill) <br /> o 40 <br /> N a' <br /> 3 <br /> o 0 <br /> •C <br /> K o g <br /> 0 <br /> O 7S FpOr g <br /> z �rQgCK ,, PATIO g <br /> )US E <br /> E \ n <br /> o <br /> n O 8� o <br /> z <br /> 34 <br /> t„ .. <br /> • I <br /> y�, ---> <br /> iff <br /> I'C -_, .. <br /> 1.0 ci <br /> N ST�I+.h 'L� <br /> I 13.6 o) °A/C l Kt <br /> N. <br /> CONC <br /> 335 N. PAD <br /> 0)BRICK R RETE ^• <br /> N <br /> /8.s <br /> EXISTING HOUSE <br /> — — J 0 BRK;K <br /> BORDER <br /> BLACKTOPI <br /> DRIVEWAY • <br /> .. South line of NW 1/4, � <br /> ' NE 1/4, Sec. 7-117-23W) <br /> • x GRAVEL <br /> o � o <br /> O GRAVEL DRIVEWAY o <br /> N <br /> N <br /> — — 1111r-11 <br /> • • DRIVEWAY <br /> East 100.00 <br /> I <br /> qq3 W� Idiqu f -PccuL <br /> _ _ _osota <br /> ' I 20 f 7 - OOL- "8 <br /> i <br />