Laserfiche WebLink
• 5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component: Length: ft Width: ft Depth: ft <br /> C. Number of Components per Row = Bed Length divided by Component Length (Round up) <br /> ft : ft = components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> components X ft = ft <br /> E. Number of Rows = Bed Width divided by Component Width (Round up) <br /> ft _ ft = rows Adjust width so this is an whole number. <br /> F. Total Number of Components = Number of Components per Row X Number of Rows <br /> X = components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition = Clean Sand Lift <br /> 3.0 ft - 1.5 ft = 1.5 ft Design Sand Lift (optional): ft <br /> B. Calculate Upslope Height: Clean Sand Lift + media depth + cover (1 ft.) = Upslope Height <br /> 1.5 ft + 0.8 ft + 1.0 ft = 3.3 ft <br /> C. Select Upslope Berm Multiplier (based on land slope): 3.23 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.23 ft X 3.3 ft =1 10.0 Ift <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope + 100 = Drop (ft) <br /> ( 10.0 I ft X 9.0 % : 100= 0.90 ft <br /> F. Calculate Downslope Mound Height: Upslope Height + Drop in Elevation = Downslope Height <br /> 3.3 ft + 0.90 ft = 4.2 ft <br /> G. Select Downslope Berm Multiplier (based on land slope): 5.18 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54_ 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> I5.18 I x 4.2 ft = 22.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width + 4 feet <br /> 16.0 ft + 4 ft =1 20.0 Ift <br /> J. Design Downslope Berm =greater of 4H and 41: 22.0 ft <br /> K. Select Endslope Berm Multiplier: I 3.00 I (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height = Endslope Berm Width <br /> I3.00 I ft XI 4.2 I ft =I 13.0 Ift <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> I 10.0 J ft + 10.0 ft + I 22.0 J ft = 42.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> I13.0 Ift + 50.0 ft +I 13.0 Ift =I 76.0 Jft <br />