My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00724 - fire sprinkler system
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2725 Wayzata Boulevard West - 33-118-23-13-0019
>
Permits/Inspections
>
2013-00724 - fire sprinkler system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:36 PM
Creation date
2/3/2020 2:53:58 PM
Metadata
Fields
Template:
x Address Old
House Number
2725
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2725 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3311823130019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> City of Orono p otttY <br /> P.U.Box 66 beta Received Partnittt m3-0 '77+4 <br /> f 2750 Kelley Parkway <br /> Crystal B my,MN 55323 AmovM 3 <br /> � <br /> (952)249.4600 AW-ed By: �� ❑CixugePlan Review <br /> ��kEs H oar en : A rw <br /> CITE'OF ORONO-FIRE ALARM OR <br /> KITCHEN EXTINGUISHER/GENERAL PERMIT <br /> (All permits mwt be approved byihe Mire lianhali edd/or 84ffding Onlcial) <br /> 1. All fire alarm systems,voluntary or required by Minnesota State Building Code(MU13C}or <br /> Minnesota State Fire Code(MUFC)shall be installed and maintained as per National Fire Protection <br /> Association(NEPA)72 and 72E, 1996 edition,National Electrical Code and manufacturers <br /> requirements, <br /> 2. Permits are required€or all fire alarm system installations. Permits can be obtained from the City of <br /> Orono-Building Official A 2750 Kelly Parkway Orono,MN or via phone(952)249-4640. <br /> Permits are also available online at:wj)2,ci.oronoajjn.us <br /> 3. Two sets of plans and specificati on sheets shall be submitted to the Orono Fire Marshal for approval <br /> at beast 7 working days before,start of installation and shall Include: <br /> a. Specification data sheets on all components of system. <br /> b. Floor plans indicating locations of devices,fire alarm control panel,sub-panels,transponders, <br /> enunciator,interconnecting wiring and zoning. <br /> c. Power connections Including source and branch circuit data. <br /> d. Type of back up power system. <br /> e. Fire alarm control panel shall be compatible with all devices, <br /> f. All components of the system shall be UL or j M listed for their applications, Smoke <br /> detectors shall be listed for commercial/Industrial use. <br /> 4. All systems shall be addressable.Smoke detectors shall be photo-electric.No combination <br /> burglar/flre alarm systems are allowed unless approved by the Orono Fire Mammal, <br /> 5. Power supply for the system sball Include battery back-up with a VL listed fire alarm panel. Alarm <br /> verification is required for all systems using smoke detectors. <br /> 6. The alarm system shall be audible above the ambient noise level in all areas of the building. <br /> Audio/visual signaling devices are required. <br /> 7. When central station notification Is required or provided it must be through a UL or FM listed <br /> communicator or control panel. <br /> 8. If a smoke detecting system installed in the tenant space of a building is directly connected to the <br /> building fire alarm panel,then <br /> a. A zone on the alarm panel must Identify the tenant space or zone of the building that the <br /> system is located(i.e.,second floor,west wing). <br /> b. A visual annunciation light shall be Installed on the corridor side of the main door of the <br /> tenants space and activate when the detection system in the tenants space activates. <br /> 9. The system shall be tested in the presence of the Orono Fire Marshal for final approval. <br /> Appointments can be made by calling the Fire Marshall at(952)473-9701, <br /> 24-bourn notice is requested. The test will include: <br /> a. Random testing of system devices. <br /> b. Random testing for system trouble and ground fault trouble. <br /> c. Correct operation of back-up power system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.