Laserfiche WebLink
0?I�T/2008 15:01 9529388910 VOSON PAGE 08109 <br /> Crystal Bay Business Center II <br /> Plumbing <br /> plan No.087584 <br /> Page 2 <br /> June 19,2008 <br /> 2. The flammable waste interceptor shall be constructed in ac l dance with the Minnesota Plumbing Code, <br /> Minnesota Rules,part x4715.1120. The interceptor <br /> a. A minimum holding capacity of 35 cubic feet. <br /> b. At least 3 feet of depth below the invertof the discharge pipe. <br /> 18 inches On the Outlet' <br /> c. A water seal of not less than 3 t d the �ugh�roof The vent must rise vertically or <br /> d. A minimum size 3-inch vent m <br /> within 45 degrees of the vertical to a point at least 6 inches above the intereeptar. The vent shall be <br /> constructed of approved metallic pipe material. and be at least 3 inches in size. <br /> e. Drains that discharge into the interceptor shall be designed to drain dry, <br /> cessible for service and maintenance. <br /> f. The interceptor shall be located so it is readily ac <br /> ly when Periodic testing is <br /> 3. The installation of reduced pressure zone backflowpre�the <br /> isp # ovc authority. Testing int�ls <br /> done by a trained backflow preventer tester acceptable <br /> shall not exceed one year,and records must be kept. All devices must be tested after initial e.The <br /> assure that debris from the piping installation five yea=s. The installnot interfered with atiofunctioning£nkflow preventers must <br /> devices shall be overhauled at least on every <br /> be at least 12 inches,but not more than 6 feet above the finished floor or ground level. This is in reference <br /> to the RPZ connection on the water supply line to the irrigation system. <br /> 4. If a water softener will be installed,then please note,that the floor drain to receive th�6 0,subpart 4• <br /> er softener <br /> discharge must be individually vented in accordance with Minnesota Rules,part <br /> 5. Changes in direction in drainage piping <br /> must be made by appropriate use of wyes and bends. Sanitary tees <br /> are not allowed where the direction of flow <br /> changes from either vertical to horizontal or horizontal to <br /> horizontal(see Minnesota Rules,part 4715.2410). <br /> 665, <br /> 6. PVC plastic pipe used for the drain,waste, and vent system shall azcto l5 with 0600) Solvent we d joints in PVC <br /> D2949 or F891 (see Minnesota Rules,part x4715.0570 through p color to the a and cement(see <br /> and CPVC pipe must include use of a primer which is of contrasting A1P <br /> Minnesota Rules,part 4715-08 10,subpart 2). <br /> 7. Plastic pipe must be installed in accordance with Minnesota Rules,part 4715.0580(1)and part 4715.0600. <br /> Above-grade horizontal runs of plastic waste and vent pipe cannot exceed 35 feet in total length. Above- <br /> grade vertical stacks constructed of plastic pipe may exceed 35 feet in total height only if an approved <br /> expansion joint is used. <br /> 8. The cast iron specified on the submitted plans as an optional material for the drain,waste,and vent must <br /> meet the quality standards specified in Minnesota Rules part 4715.0570 through 4715.0600. No quality <br /> standard is specified for this material- <br /> 9. No material is specified for the rainwater leaders. Verify that pipe materials <br /> e 60.to be used for the rainwater <br /> leaders will comply with Minnesota Rules,parts 4715 8h <br /> 10. Disinfection of the potable water system must include the following(see Minnesota Rulcs,part 4715.2250): <br /> a. The pipe system must be flushed with clean,potable water until no dirty water appears at the points of <br /> outlet; <br />