Laserfiche WebLink
tea ,. <br /> (0 <br /> CITY of ORONO <br /> Municipal Offices <br /> yw'G�i Street Address: Mailing Address: <br /> 9kEI`I Y jI <br /> SI4.0.e° 2750 Kelley Parkway P.O. Box 66 <br /> -�--�% Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address ? j (,,�hC' G i k r <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes ✓ <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identji as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31, 2010 ✓ <br /> Other <br /> Septic Tank(s..Pump out Needed <br /> Yes ��// <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> to (.4 -`lo-t . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> r/r <br /> Inspecto-r: 4 Date of Inspection /0 .c� . <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />