Laserfiche WebLink
S-P ,TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> October 8, 1994 <br /> John Shannon <br /> 2760 White Oak Circle <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , four <br /> bedroom home Designed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances . <br /> This site has an existing non-conforming system with the bottom <br /> of the system less than 3 ' from saturated soils (mottled soil ) . <br /> A Soil Boring into the existing system indicated the system <br /> is hydraulically overloaded. <br /> The soils on this site are a clay loam. A seasonally high water <br /> table was located at 22" & 24" , (mottled soil ) . Que to the <br /> seasonally high water table, a Pressurized Mound System will <br /> need to be installed. The bottom of the rock bed must be located <br /> at least 3 ' above the seasonally high water table . <br /> The existing tanks may be used upon approval by the local Inspector . <br /> The tanks must be water tight. Approval will be needed from the <br /> city to be 50 ' away from the stream. See site plan. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 10 . 8 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area . <br /> The supply line will need to cross a stream. Recommend to install <br /> the supply line deep below the frost line but allow the manifold <br /> & approx. 75 ' of the supply line to have back drainage. A second <br /> option would be to exit the pumping chamber near the bottom of <br /> the tank approx. 18" above the bottom to allow total back drainage. <br /> The new exit from the tank must be properly sealed. <br /> The manifold and supply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod , be sure not to over work. <br /> CONT ' D <br />