Laserfiche WebLink
CZ-16-2012 06:13PM FROM-Veit Companies 763 428 8348 T-827 P-003/003 F-663 <br /> f <br /> 5. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific <br /> prior approval is obtained in writing for temporary use thereof. <br /> 6. Completely remove foundation(s)from the ground. <br /> 7. Completely dispose of all demolition debris off site in accordance with all applicable PCA <br /> requirements. <br /> 8. Abandon water wells in accordance with State Health Department regulations. <br /> 9. Call for an inspection when all debris has been removed,before backfilling. <br /> 10. Within 5 working days of superstructure removal, a final inspection shall be requested. The site <br /> shall be left clean and clear of all debris, with any excavation filled with earth level with the <br /> adjacent ground elevation (except when such excavation is to be used as pan of a new building <br /> and such new building is actually under constriction). <br /> 11. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, <br /> crushed and filled with native soils. An inspection is required after the tanks are pumped and <br /> before the tanks are crushed and filled. <br /> 12.The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono,its <br /> 1 agents, employees and assigns from and against all claims, damages, losses or expenses, <br /> ------ including attorney,fees;-against the City, its agents, employees and assigns arising'out of`of <br /> resulting from the demolition described herein as performed by the property owner, his <br /> employees,agents,subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> © $75.00—Principal Structure $ 75. 00 <br /> ❑ $50.00—Accessory Structure x (how many) <br /> 1. Subtotal of above permit requested $ 75.00 <br /> 2. State Surcharge 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ 80- 00 <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit,agrees to do all <br /> the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complete,true and correct. <br /> Applicant's Signature: Date: Feb. 17, 2012 <br /> Owner's Signature: Date: <br /> Approved By: Date: <br /> (Building Official) <br /> *Zoning Disclosure Required? ❑ YESO <br /> 'This must be filled out by Zoning Dcpartment—For eithWanswer,a Zoning Official must sign all applications. <br /> *Approved By: Date: 2" <br /> (Zoning Official) <br />