Laserfiche WebLink
. • • CHECK OFF LIST FOR ISSUANCE OF PERMITS <br /> FOR OFFICE USE ONLY <br /> ADDRESS OR LEGAL: -2..M..(.7 wti STC DAY- c-kec it PID: <br /> DESCRIPTION OF WORK: PO2C14 <br /> ZONING REVIEW BY: <br /> .P <br /> C'� (QOM DATE APPROVED: 730 -ciZ <br /> BUILDING REVIEW BY: DATE APPROVED: 7-30-52-- <br /> FEES <br /> -30-5ZFEES TO BE CHARGED: Misc. Fees Calculated By: <br /> PERMIT Yes / No <br /> PLAN REVIEW Yes 1/ No SEWER CONNECTION <br /> STATE SURCHARGE Yes j - NoCONNECTION PARK FEE <br /> INVESTIGATION FEE Yes NO <br /> SAC Yes No SITE INSPECTION <br /> Number of SAC Units OTHER (specify) <br /> ZONING CHECK LIST Zoning District: W.-1B <br /> Fire Department: (JD" <br /> •'-44/Ce Post Office: CAAJAL- School District: NIC_ <br /> Lot Area: /✓/C, Width: tkth_ Depth: A/k_ <br /> Survey Submitted: Yes p( No Date of Survey: 6•Z/-499 <br /> Proposed Setbacks: Ri ht Side: (0O( t <br /> Front (Lake) : SO g <br /> Rear (Street) : N/6 Left Side: /10/+ <br /> Adjacent Structures : Arr 4 4409 Wetland: /V//I <br /> Building Height: Def . Hgt. 0- 14.- Peak Hgt. <br /> Avg. Setback: /V M Lot Coverage: <br /> Existing Proposed <br /> Hardcover: 0-75 ' <br /> 75-250 ' <br /> 250-500 ' <br /> 500-1000 ' <br /> Hardcover Varianc Require. : Ye- <br /> No sate o Council Approval: <br /> Grading: Staff A proval Da e: By: <br /> Council Approval Date: <br /> • <br /> Septic: Staff A proval Dat - : By: <br /> j <br /> Zoning File:# R,so utio- #: Resolution Date: <br /> / <br /> REMARKS (in ouse) : / <br /> / <br /> // / <br />