My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Grant of Permmanent Easement
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2725 Wayzata Boulevard West - 33-118-23-13-0019
>
Misc
>
Grant of Permmanent Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:37 PM
Creation date
2/3/2020 11:18:34 AM
Metadata
Fields
Template:
x Address Old
House Number
2725
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2725 Wayzata Boulevard West
Document Type
Misc
PIN
3311823130019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the City, a warranty bond is provided, and the Public Improvements are accepted by the City <br /> Council. The City standard specifications for utilities construction outline procedures for security <br /> reductions as provided in Orono City Code Section 82-214. The warranty bond shall have a <br /> duration of twenty-four(24)months. <br /> 17. STORM WATER AND DRAINAGE TRUNK FEE. The Development is <br /> subject to a Storm Water and Drainage Trunk Fee in the amount of $128,100.00. The fee is <br /> based on the gross area of the final Plat less any area credit for pond area, and is calculated as <br /> follows: <br /> $7,320.00 per acre x 17.5 acres = $128,100.00 The total fee for the <br /> Development of$128,100.00 shall be paid by the Developer in cash upon the execution of this <br /> Agreement. In no event shall any additional fee for Storm Water and Drainage Trunk be payable <br /> by Developer or assessed against the Development Property as a result of the construction of the <br /> Public Improvements as defined herein. The Development Property shall not be subject to a <br /> special assessment in connection with the initial installation of the street labeled "Orono <br /> Industrial Boulevard" on the land to the east of the Development Property. <br /> 18. PARK DEDICATION FEE. Developer shall pay a Park Dedication Fee for Lot <br /> 1, Block 1, based upon 8%of the market value of the property calculated as follows: <br /> $750,000.00 x 8% = $60,000.00 <br /> The Developer shall also pay a Park Dedication Fee for Lot 2, Block 2 calculated as <br /> follows: <br /> 3.01 acres x $13,875.00/acre= $41,764.00 <br /> 132281 v1 <br /> - 11 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.