Laserfiche WebLink
C13.0 Lighting Plan <br /> C14.0 Orono Industrial Blvd Plan and Profile <br /> C 15.0-C 15.1 Civil Details <br /> 9. DESIGN STANDARDS. <br /> A. The Developer received Conditional Use Permit approval for a portion of <br /> the property to be known as Lot 1, Block 1, Crystal Bay Business Center to allow the building on <br /> this lot to have 50% to 60% burnished block and 40% to 50% rock face block as alternative <br /> materials. <br /> B. The Developer received variance approval on September 11, 2006, for a <br /> narrower street right of way than required by City standards. The right of way for the new street <br /> is to be 60 feet wide whereas the subdivision regulations would require a 70 foot wide right of <br /> way. The street shall be named "Orono Industrial Boulevard." Work to be performed on Orono <br /> Industrial Boulevard, Old Crystal Bay Road, and the ditch upgrade and improvements along <br /> Highway 12 shall be completed before a shell Certificate of Occupancy is issued for Lot 1, Block <br /> 1, or Lot 1, Block 2. Work to be performed on Old Crystal Bay Road and the ditch upgrade and <br /> improvements along Highway 12 shall be completed before a shell Certificate of Occupancy is <br /> issued for Lot 2, Block 2. <br /> 10. PERMITS. The Developer shall obtain or require its contractors and <br /> subcontractors to obtain any necessary permits, which may include: <br /> • Hennepin County for County Road Access and Work in County Rights-of- <br /> Way <br /> • MnDot for State Highway Access <br /> • Minnesota Department of Health for Watermains <br /> • NPDES Permit for Stormwater Connections <br /> • MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal <br /> • DNR for Dewatering <br /> • City of Orono for Building Permits <br /> • Minnehaha Creek Watershed District <br /> 132281 v11 <br /> -7 - <br />