My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic System Inspections
Orono
>
Property Files
>
Street Address
>
W
>
White Oak Circle
>
2715 White Oak Cir - 04-117-23-42-0026
>
Septic
>
Septic System Inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:14:23 PM
Creation date
2/3/2020 9:27:39 AM
Metadata
Fields
Template:
x Address Old
House Number
2715
Street Name
White Oak
Street Type
Circle
Address
2715 White Oak Cir
Document Type
Septic
PIN
0411723420026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
134 <br /> o <br /> CITY of ORONO <br /> Municipal Offices <br /> C1:1 Street Address: MailingAddress: <br /> ' EggOg� 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: 5-te er. )er\N'j qeS Address: 5 wl\;te 091( C-,rc 1R- <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): 3 <br /> 1 "CODE SYSTEM" An ISTS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the current Orono Municipal <br /> Code but does meet the three foot separation requirement,and which is not failing or an imminent threat to public health or safety. <br /> 3O "NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> or may not meet all the location,design,or construction standards ofthe current Orono Municipal Code and which is failing for any reason;and <br /> any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. <br /> TANK CONDITION(5-10): (o <br /> Tank inspection indicates: <br /> 5 Pumpout not needed at this time. <br /> (.) Tank must be pumped out this year (city code requires tanks to be pumped out every 3 years. Tank was last pumped 8-a7-q ). <br /> 7 Solids accumulation in tanks is at a critical a critical level. Tanks should be pumped out as soon as possible. <br /> 8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be installed in each tank at next pumpout. If tanks <br /> have not been pumped out within the last three years,they should be pumped out now. <br /> 10 Inspection pipe is located directly over tank baffle(does not give accurate measurement of solids accumulation). If tanks have not been pumped <br /> out within the last three years,they should be pumped out now. <br /> DRAINFIELD CONDITION(11-14): 1" <br /> 11 Drainfield is dry,no surfacing evident. <br /> 12 Some evidence of surfacing,not critical yet <br /> • <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector immediately.Repairs must be <br /> completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> COMMENTS: 51 S tem ,S ' - co -rt. 'k () 3 -CO 01- seerq�:or. <br /> b2xwe�r. Aco� ak 5eoSor \ wc�t-er�rnblc RN bo <br /> y'� -rlo� o:F -�c'cN�1,2s6y -laid <br /> _ (Ze�1cr� 1�,-31 . <br /> sr e Sc- 'f�� �ti�c ..as bec, vr^ CO ..r �.:� \asr 3 yet)(5, <br /> \ o — C\ \ c <br /> Date of Inspection Septic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that this report does not guarantee <br /> or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.