Laserfiche WebLink
CP• <br /> S-P VESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> July 28 , 1993 <br /> Roy Rassmussen <br /> 2700 White Oak Circle <br /> Orono, Henn. Co. , MN <br /> This site has an existing Non-Conforming On-Site Sewage Treatment <br /> System which does not meet the 3 ' seperation from the seasonally <br /> high water table. To adequately treat septic effluent, a Pressurized <br /> Mound System will need to be installed. The area to be used is in <br /> the southeast corner of the property. On the west end of the proposed <br /> system, approx. 20 ' of the mound will need to overlap a 10 ' wide berm <br /> 3 ' high. This berm will need to be removed with a backhoe without <br /> compacting the proposed mound site. When the berm was built, the <br /> soils were pushed from the west with very little travel on the area <br /> to be used. This is the only area available for the placement of <br /> a Pressurized Mound System. The slope is at 8% . The City code <br /> has a maximum of 6% , this will need to be approved by the City <br /> Official . The City also requires a 20 ' setback from the property <br /> line, approval will be needed for 10 ' . <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , four <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 and local ordinances . <br /> The soils on this site are SCS soils mapped - LrB - Lester loam. <br /> A seasonally high water table was located at 24" & 28" . The <br /> bottom of the rock bed must be located at least 3 ' above the <br /> seasonally high water table. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 14 . 1 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber . The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> not to over work. <br /> CONT' D <br />