My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993 - 005587 - repair system
Orono
>
Property Files
>
Street Address
>
W
>
White Oak Circle
>
2700 White Oak Cir - 04-117-23-42-0021
>
Septic
>
1993 - 005587 - repair system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:14:17 PM
Creation date
2/3/2020 8:50:31 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
White Oak
Street Type
Circle
Address
2700 White Oak Cir
Document Type
Septic
PIN
0411723420021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> APPLICATION FOR SEPTIC SYSTEM PERMIT <br /> CITY OF ORONO <br /> Box 66 (1335 So Brown Rd) <br /> Crystal Bay, MN 55323 <br /> *************************************************************************** <br /> General Instructions : <br /> 1. You may apply for septic system permits by mail or in person at the <br /> City offices. However, permits will not be mailed out and must be <br /> picked up in person at the City offices. <br /> 2. Permits are not valid until you receive a permit card. <br /> 3. Work must not begin unless the permit card is available on the job <br /> site. <br /> 4. Permits will be issued only to contractors holding a City of Orono <br /> Septic System Installer ' s License. <br /> 5 . All work must be done in accordance with the approved septic system <br /> design. Design reports are not considered approved unless accompanied <br /> by the "City of Orono Septic System Approval" cover sheet signed by <br /> the City Inspector. <br /> 6. The following inspections will be required for all septic systems: <br /> a ) Pre-installation site inspection to include inspector, installer, <br /> and general contractor. <br /> b) Tank installation prior to covering. <br /> c) Drainfield trench installation prior to covering. For mounds, <br /> inspection is required after rough-up but prior to sand placement <br /> ( sand will be jar tested for silt content) , and again during <br /> pressure distribution piping installation in the rock bed. <br /> d) Final inspection to verify proper final cover depths and to <br /> verify that all pump station (where required) components are <br /> functional and comply with codes. <br /> 7. Individual holding MPCA Installer Certificate shall be present during <br /> installation. 24-hour notice is required for all inspections. <br /> *************************************************************************** <br /> JOB SITE ADDRESS: c.,2 7Li c-> .A7/ /t /C= (ā sā <br /> Occupancy Type: //Residential X Commercial Other <br /> Owner' s Name: `lie/ "ā,/.1/Liel Phone: <br /> Mailing Address : City: Zip: <br /> Septic Contractor' s Name: --/ ;-/../ Bus. Phone:y73-1X3 ( <br /> Mailing Address : r, City: Zip: 575-3.-%- <br /> ****************************,q *********************f********************** <br /> 1l - over - <br /> "b, G'Vej rrfd Gam/ //), 7 qs <br />
The URL can be used to link to this page
Your browser does not support the video tag.