My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-24-1993 re: conn. to sewer system
Orono
>
Property Files
>
Street Address
>
W
>
Westlake Street (2)
>
372 Westlake St - 05-117-23-23-0044
>
Correspondence
>
03-24-1993 re: conn. to sewer system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:20:48 PM
Creation date
1/31/2020 1:31:26 PM
Metadata
Fields
Template:
x Address Old
House Number
372
Street Name
Westlake
Street Type
Street
Address
372 Westlake St
Document Type
Correspondence
PIN
0511723230044
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stubbs Bay <br /> March 24, 1993 <br /> Page 2 <br /> 7. The pipe from your residence to the service stub should be at a depth of at least <br /> 4-6' for the majority of its length to avoid freezing problems. Any connection <br /> piping at a depth less than 42" or underneath driveways or parking areas that will <br /> be cleared of snow during the winter, shall be provided with suitable insulation. <br /> 8. The State Health Department requires a minimum separation of 20' between <br /> wells and air tested sewer lines, 50' between wells and non-air tested lines. If <br /> your connection must be between 20' and 50' from your well or a neighbor's <br /> well, your contractor will be required to air test your connection. <br /> 9. Upon connection, the quarterly sewer service charge will be $51.15 (1993 rate). <br /> 10. Once sewer is available for connection, you have up to five years to connect, <br /> unless your existing septic system is found to be failing prior to the end of the <br /> five year time period. According to City policy, all properties will begin to pay <br /> the full sanitary sewer fee at the end of the designated connection period whether <br /> they have connected to the system or not. <br /> It is the normal policy of the City that when a sewer project is complete, all <br /> properties in the project must connect within 16 months (two construction <br /> seasons). If the properties do not connect within 16 months, they pay a sewer <br /> service charge that is equivalent to the quarterly sewer fee of$51.15. As part of <br /> the negotiation process to resolve the Stubbs Bay assessment issue, the Council <br /> agreed that those properties with conforming septic systems could take up to 5 <br /> years to connect to the sewer system. The Council also agreed that those with <br /> the 5 year connection period, who do not connect within the 16 months period, <br /> will pay an "unconnected property charge" of$24.30 per quarter rather than the <br /> sewer service charge of $51.15 per quarter. The unconnected property charge <br /> is the property's share of the cost of maintaining and repairing the sewer system. <br /> Because those properties with the 5 year connection period continue to use their <br /> septic systems, they will continue to be charged the annual septic fee of $50.00 <br /> until they connect to the sewer system. <br /> If you have other questions or comments, please feel free to contact me; Bruce Vang, Building <br /> Inspector; or Lyle Oman, Building Official. <br /> Sincerely, <br /> John R. Gerhardson <br /> Public Works Director <br /> JRG/lsv <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.