My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014 - 00137 - new structure
Orono
>
Property Files
>
Street Address
>
W
>
Westlake Street
>
364 Westlake Street- 05-117-23-23-0043
>
Permits/Inspections
>
2014 - 00137 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:20:37 PM
Creation date
1/31/2020 10:26:42 AM
Metadata
Fields
Template:
x Address Old
House Number
364
Street Name
Westlake
Street Type
Street
Address
364 Westlake St
Document Type
Permits/Inspections
PIN
0511723230043
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B <br /> Ventilation Method <br /> (Choose either balanced or exhaust only) <br /> E✓ Balanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recov- ❑ Exhaust only <br /> ery Ventilator)—cfm of unit in low must not exceed continuous venti- Continuous fan rating in cfm <br /> lation rating by more than 100%. <br /> Low cfm: 80 High cfm: <br /> 140 <br /> Continuous fan rating in cfm(capacity must not exceed <br /> continuous ventilation rating by more than 100%) <br /> Directions-Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or ERV's. <br /> Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous ventilation rate and <br /> less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) <br /> Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br /> Section C <br /> Ventilation Fan Schedule <br /> Description Location Continuous Intermittent <br /> Directions-The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous <br /> or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating <br /> and less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not <br /> exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br /> Section D <br /> Ventilation Controls <br /> (Describe operation and control of the continuous and intermittent ventilation) <br /> 2-HRV's will be controlled by wall control <br /> Directions-Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and <br /> installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If <br /> exhaust fans are used for building ventilation,describe the operation and location of any controls,indicators and legends. If an ERV or HRV is to be <br /> installed,describe how it will be installed.If it will be connected and interfaced with the air handling equipment,please describe such connections as <br /> detailed in the manufactures'installation instructions.If the installation instructions require or recommend the equipment to be interlocked with the <br /> air handling equipment for proper operation,such interconnection shall be made and described. <br />
The URL can be used to link to this page
Your browser does not support the video tag.