Laserfiche WebLink
Nail the floor sheathing to the <br /> blocking w/at least(12)0.131" <br /> diameter x 3"long nails evenly <br /> spaced Wall framing,trusses,&structural <br /> rim by othl< >1 ers <br /> See note 4 for spacers as required <br /> at mechanical only <br /> • <br /> Use Class D connection from S3 <br /> /for blocking to sill <br /> / Nail rim truss bottom chord to sill <br /> NM . kgs' plate w/0.148"diameter x 3"long <br /> nails @6"o.c. <br /> Install 2x4 minimum flat blocking <br /> between trusses as required to <br /> achieve the nailing noted 2x6 minimum sill plate w/1/2" <br /> (minimum of two spaces),spaces diameter anchor bolts w/7" <br /> used do not need to be next to minimum embed&2"wide x 1/8" <br /> each other if spaces between are thick square or round countersunk <br /> blocked per note 4 flush washers or alternative anchor <br /> (see table on S2 for spacing) <br /> (Anchor bolt clearance between <br /> Install 3/4"minimum thick OSB/plywood to one edge of both wall and sill plate is to <br /> side of 2x4 blocking w/(6)0.131"diameter x 3" be 2.5"), NOTE: Sill plate may <br /> long nails top&bottom OR 1/2"minimum thick have to be increased to 2x8 to fit <br /> OSB/plywood to each side w/(4)0.131" NJ <br /> Class D connectors <br /> diameter x 3"long nails top&bottom <br /> BOTTOM CHORD BEARING TRUSS BLOCKING DETAIL <br /> Blocking spacing to match anchor bolt spacing (see S2) <br /> 1. Floor sheathing is to be 3/4"minimum thick C6B/plywood installed in a staggered pattern. Neil to floor members with 0.131"diameter x <br /> 3"long nails at 6"o.c. at all panel edges/perimeter and 12"o.c.at all intermediate supports or an appro,ed equivalent. <br /> 2. Blocking shown may be replaced with pre-manufactured blocking provided it can resist at least 1500 pounds of lateral compression. <br /> 3. Toe nail blocking members in place as required for stabilty. <br /> 4. Bays containing blocking do not need to be directlynext to the wall or each other prodded 2x4 spacer blocking is installed between <br /> them as shown. Toe nail spacers in place as required. <br /> 5. OSB/plywood blocking maycontain 4"diameter mazmum holes if required for electrical/plumbing. R-ovide at least 3"edge clearance <br /> for all holes. <br /> 6. All nails are to be spaced in members such that splitting does not occur. <br /> 7. Foundation wall is to be per Qhde by others. <br /> 8. Do not cut rim truss bottom chord hr any reason. <br /> Oswell Engineering and Consulting, L.L.0 1901 E Hennepin Ave,#201 c, st. ' 41. <br /> Project Name: 2014 Standardized Top of Foundation Support Drawings Minneapolis,MN 55413 Ize4 <br /> Description: Non-Bearing Wall Bottom Chord Bearing Truss Blocking Detail(NOT TO SCALE) Phone:612-720-4639 <br /> Project# 13.100 Fax:612-886-2966 tom* I <br /> Client Name: Abfalter Brothers Concrete LLC www.oswellec.com a <br /> Client Address: 15546 Cleveland Street, Elk River, MN 55330 Page S5 of S6 r. s <br /> 1/1/2014 <br />