Laserfiche WebLink
l <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Thursday, April 03, 2014 11:35 AM <br /> To: LDKBuilders@yahoo.com <br /> Cc: Rory Synstelien; Mike Shields; Scott Koppendrayer; Melanie Curtis <br /> Subject: 364 Westlake St. I#2014-00137 <br /> Larry, <br /> As you have indicated you plan to change the lower level door opening to 6 feet or less, please have the plans updated <br /> to reflect this change and submit two full-size copies for us to review. <br /> Also, City Engineer,Jesse Struve has reviewed the survey emailed to us dated 3-28-14. See his comments below. <br /> Please don't hesitate to contact us if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono MN 55356 (physical address) <br /> PO Box 66 ! Crystal Bay ': MN 55323-0066 (mailing address) <br /> S 952.249.4620 g 952.249.4616 <br /> ® cmattson@ci.orono.mn.us www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> From: Jesse Struve <br /> Sent: Thursday, April 03, 2014 9:31 AM <br /> To: Christine Mattson <br /> Subject: RE: 364 Westlake St. / #2014-00137 <br /> Christine, <br /> The survey still needs a couple of small updates or clarifications: <br /> 1. The tiered retaining wall by the driveway needs to be separated by 2x the height of the upper wall (8'). This also <br /> applies to where the two walls meet. <br /> 2. The retaining wall south of the house exceeds 4' in height (4.2') and will need to be designed by a registered <br /> professional engineer or the area will need to be lowered by the 0.2'to reduce the wall height. <br /> 3. The proposed sanitary sewer route is shown, but based on the invert in the street this line will be consistently <br /> about 16' deep. How are they planning on installing this service line(directional drill or open cut). By relocating <br /> the service,the applicant will need to post a$5,000 escrow for the required street cut. They will also be <br /> required to cover the costs for someone to watch and test their backfilling operations in the street. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br />