Laserfiche WebLink
Par= B. DEPRESSURIZATION PROTECTION! <br /> r <br /> check option used: Fuel Burning(complete schedules below) i::No fuel burning equipment <br /> INSTRUCTIONS Exhaust..Make-Up Air Schedule* ' ''i <br /> Step i. Complete the cumbustion Equipment Schedule below. Only equipment Exhaust devices over 300 cfm Flow <br /> with a Y (Yes) tnay be selected under"Category i"alternative cfm <br /> Step a. Complete the Exhaust/Make-up Air Schedule on the right if direct or power elm <br /> vented or solid fuel atmospheric vent space heating equipment is selected. elm <br /> COMBUTION EQUIPMENT SCHEDULE <br /> I (check all types proposed) <br /> Space heating- nonsolid fuel ❑Sealed cumbustion Y Hearth-nonsolid Fuel D Sealed combustion Y <br /> o Direct or power vented '* ❑Direct or power vented Y <br /> Atmossherically.vented: N Atmosphericaly vented N <br /> Water heating-nonsolid fuel D Sealed cumbustion Y: Space heating-solid fuel o Atmosphericaly vented Y'" <br /> ❑Direct or power vented Y Water heating - solid fuel o Atmosphericaly vented Y <br /> t Atntossherically vented N Hearth-solid Fuel ❑Atmosohericaly vented Y <br /> * If atmospherically vented solid fuel or direct or power vented nonsolid fuel space heating is sinstalled , then make-up air to match <br /> flow is required for each individule exhaust device which exceeds 30o cubic feet per minute. <br /> AMMER <br /> Part Ci VENTILATION <br /> VENTILATION QUANTITY <br /> (Mechanical ventilation must be provided per the larger quantity calculated below) <br /> I <br /> ,�t7,`[O cubic feet x 0.005831 minute = / ---e., - cfm ( t-/ x 15 cfmj bedroom) + 15 cfm = 71c--- cfm <br /> volume of habitable rooms number of bedrooms <br /> VENTILATION FAN SCHEDULE <br /> Check meathod(s) proposed 0 Exhaust only IR-Balanced (heat recovery ventilator, air exchanger. etc.) <br /> Fan description or location ' 1/c��1492/4/E 27 0 TOTALS <br /> VENTILATION Intake / ,r cfm cfm cfm cfm cfm <br /> AS DESIGNED Exhaust i7c,vcfm cfm cfm cfm cfm <br /> Statement of Compliance: The proposed building design represented in these documents is consistent with the building plans, <br /> specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the <br /> requirements of the Minnesota Energy Code. <br /> V <br /> Application (print name) Signitu F � Date Telephone number <br /> Part C2. V E N T I LAT T O 1`d (Sumit Part Ca upon completion of system verification) <br /> Job Site Address: Permit Number <br /> Fan description or location TOTALS <br /> MEASURED Intake cfm cfm cfm cfm cfm <br /> PERFORMANCE Exhaust cfm cfm cfm cfm cfm <br /> Ventilation ate must be measured and verified when the performance option is used in lieu of the perscriptive option for the sealing. <br /> of joints in the building conditioned envelope. (from Part A) <br /> Compliance Statement: Installed ventilation system is in compliance with MN Energy Code and is sized to provide the design air flow. <br /> Applicant (print name) Signiture Date Telephone Number <br />