Laserfiche WebLink
4. •TOTAL EXPOSED ROOF/CEILING CALCULATIONS: <br /> Total exposed <br /> roof/ceiling area ((n 9r) sq ft <br /> J) Total skylight area (` ) sq ft x "U" O - O <br /> k) Total roof/ceiling framing '�?? <br /> area (Average 109;) 1 <br /> (0 sq ft x "U" • OJ - 69. 08 <br /> 1) Total net insulated <br /> roof/ceiling area /52, I sq ft x "U" 0 • OZ C . 31:)•4Z <br /> 4. TOTAL J) thru 1) 36,..5- <br /> If <br /> '-5If total of #4 is the same as , or less than #2, you have met the intent of <br /> 2 MCAR 1.16008 A and 0. <br /> ALTERNATE BUILDING ENVELOPE DESIGN <br /> To utilize the total envelope system method, the values established by the sum <br /> of items '3 and H4 shall not be greater than the sum of items #1 and 02. <br /> 1 . '1% + 2. -43. 9 5.39. 9 <br /> 3. 427. 4 + 4. CO .�_ b." • I <br /> CERTIFICATION <br /> 1 hereby certify that I have calculated the "U" factors and "R" <br /> values herein and that the building here described meets or exceeds the State <br /> of Minnesota Energy Conservation Act. <br /> -/LeI.A147i <br /> MAW <br /> (Signature) <br /> .//i7 /C/Z- <br /> (Date) Page 2 <br />