Laserfiche WebLink
'PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: ( 2 a WEST `/^�� e --CeMI Permit No.: <br /> Description of work: /700 4/4'//1 91 8014,00`1 Date Rec'd: <br /> Jo <br /> Septic review by: 5-Q 'e t(.41/1 <br /> /" ?- / Date Approved: /1//// <br /> Zoning review by: Date Approved: <br /> ..- <br /> / / <br /> Building review by: 9y/_t r � � 2� Date Approved: � 0' <br /> Grading review by: Date Approved: <br /> Zoning District: Z Hing File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF ok <br /> Survey Submitted: 0 Yes 0 No \ Date of Survey: Revised date(?): <br /> Landscape plan submitted? 0 Yes „0 No Landscaper: <br /> t <br /> Proposed Setbacks: <br /> 1 <br /> Front (Lake) Rear(Street) ( N S E W ) ( N ,b E W ) Other Buildings Wetland <br /> Sh e /Side <br /> Defined Height: Peak Height: FFE. FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50% L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the low st pr..osed Slab at or above grade— <br /> START WITH floor(of the basement or cra I space and measure from highest existing <br /> the highest point of the roof START WITH grade to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distanc: from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof highest point of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hippgrd roof SUBTRACTION • GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> lS the distance between the <br /> windows): ubtract half the distance ROOF TYPE) highest point of the roof to <br /> between the top of the highest <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). \ point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />