Laserfiche WebLink
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Tuesday,November 12,2019 <br /> 6:00 o'clock p.m. <br /> Mr. Bonnett said he would like to know where the path has to be because eventually,they would like to <br /> build on some flat ground.He reiterated that he has to get something if he is giving something. <br /> Walsh stated the City would like the best path, easy walking. The path that is there now is very walkable. <br /> He suggested working with Staff, and if there were a better route that makes sense that can be put in <br /> without a lot of difficulty,that would be fine. If the City were to do an entire huge grading project,the <br /> City might as well put in the hammerhead and deal with what the City has. <br /> Mr. Bonnett said putting in the hammerhead would be expensive,paving the end of the land would be <br /> expensive, and grading the path to put a path in would be a lot of money. <br /> Walsh commented the existing path is really good. Everything else, once you get to the hill, is steep.At <br /> the end of the street, if you go left, it's a non-working solution. <br /> Mr. Bonnett, using a map, suggested a route which would curve down into the path and thought the <br /> confusion might be over the wording of"direct"or"indirect." <br /> Crosby asked why the City wouldn't just be able to move the cul-de-sac to the end of the road. <br /> Mr. Bonnett responded with why would you just want to drive farther for the fun of it.He added that also <br /> does not get him what he wants,which means the City will not get the cul-de-sac that everybody would <br /> want. He stated he wants to work with the City. <br /> Mr. Bonnett asked where the City wanted the cul-de-sac to move. <br /> Crosby said down to the end. <br /> Mr. Bonnett asked if he should amend that part of the plan and pointed to the map. <br /> Walsh stated the applicant and Staff needs to figure out what makes the most sense, but the existing <br /> pathway is the best pathway. <br /> Mr. Bonnett commented that the Engineer said that's where it should go because that's where the manhole <br /> cover is, which the City wants access to with their big trucks. <br /> Walsh reiterated the applicant should work with Staff because he is not here to plan the road,that's what <br /> Jeremy and Adam do, and if they can bring back a recommendation knowing what's been said tonight as <br /> to the most logical and best place, and then the applicant can talk to them about the pathway. <br /> Mr. Bonnett said he is in favor of that and he understands that and the easements.He said if everything <br /> has to be voted on and waited out,with all due respect to Mr. Johnson, he would be back after the road <br /> gets repaved,which is what he wants to avoid. <br /> Mr. Bonnett indicated he just heard about the easement today or yesterday. <br /> Barnhart indicated he thought it was Friday. <br /> Mr. Bonnett said he is trying to get it as complete as he can and appease everybody. <br /> Page 11 of 17 <br />