My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-17 Septic System Inventory
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1480 Sixth Ave N- 26-118-23-32-0008
>
Septic
>
09-12-17 Septic System Inventory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:17:01 PM
Creation date
1/29/2020 11:14:46 AM
Metadata
Fields
Template:
x Address Old
House Number
1480
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1480 6th Avenue North
Document Type
Septic
PIN
2611823320008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTIC SYSTEM INVENTORY <br />Site Address: 1480 Sixth Ave N <br />Owner Name: Dan & Ericka Gulbrandson <br />Owner Address: 1480 Sixth Ave N Long Lake MN 55356 - <br />PID 26-118-23-32-0008 <br />BuildingTvpe: residence Installer: E. J. Peterson Co. <br />Date of Permit: 4/10107 <br />System Type: mound BR's Designed for 4 <br />In Musa?: No Shoreland?: <br />SEPTIC TANKS: <br />Material, precast concrete Capacity: 1300, 1300, 1300, 1500H Tank Filter: yes <br />DRAINFIELD: <br />Treatment Area: 500 Soil Boring: yes DF Ht above Wt: 3 <br />WELL DATA <br />Setbacks - Well Tanks: 75 Well DF: 100 Report In File: Depth: 140 <br />Date Notes <br />3/31/2016;As-Built received - Brad Hayes <br />11/13/2014,Hayes and Sons new mound system <br />4/3/20121Point of sale compliance inspection valid until 04/03/2015 <br />6/26/2007',New Install <br />10/7/2002jsurfacing, replace by 10/1/2003 <br />3/21/2000,non-compliant, no surfacing, repair 12/31/10 <br />9/17/1998jnon-compliant-DF surfacing, repair 10/17/98 <br />12/2/1997non-compliant-DF surfacing, repair 7/15/98 <br />5/29/1996 non -conforming -DF surfacing, repair by 7/31/96 <br />5/15/1995non-conforming-DF surfacing <br />8/18/1992new connection between DF laterals <br />5/1/1992 DF surfacing -repair by 7/1/92 <br />4/18/1991!DF surfacing <br />9/13/1990,DF surfacing -tanks overfull,pump now (within 1 month) <br />7/13/1988DF saturated and/or 2nd tank surfacing <br />2/6/1987ino surfacing <br />8/12/1986!DF saturated <br />4/13/1984;no surfacing <br />6/16/19801no surfacing <br />6/16/1980,no surfacing <br />Date <br />9/12/2017' <br />11/13/2014 <br />9/18/2014 <br />4/3/2012 <br />6/29/2011 <br />9/1/2009 <br />6/26/2007 <br />6/26/2007. <br />GallonsOfLiquid <br />5000; <br />6 <br />3500 <br />3500' <br />3500'. <br />35001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.