Laserfiche WebLink
NOV 14 '02 09:33 FROMI:CONSTRUCTION 1t10RTGAGE INVESTORS CO. 612-470-3629 T-402 P.04/04 F-847 <br /> [ ) gaps green framing less than one-half inch are eliminated by securing frarrtiug togetha u, are <br /> insulated at the time of assembly• <br /> I ) all penetrations between conditionad and unconditioned spaces made prior to framing inspection are <br /> sealed• <br /> Interior Air Barrier <br /> l all fire stops are air sealed <br /> [ ] pipes,ducts,wires,equiptttcnt and flues and chimneys through the interior air harrier arc ,,slcxi <br /> [ ] a scaled continuous interior air barrier is installed on the warm side of the building envelope at <br /> ceilings,walls,and floor rim joist areas' <br /> I I sir barrier behind tub and shower is sealed and protected <br /> [ ] recessed light factures arc sealed <br /> Envelope Insulation <br /> [ 1 basement insulation R-5 minimum <br /> [ ] wind wash barrier on wall separating house and garage is sealed <br /> l loose fill insulation is prevented from enterR*the eaves <br /> I ] insulation on skylight shafts and walls exposed in attics is supported on the unconditioned ,ice <br /> Ards Insulation <br /> [ ] attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel <br /> ( ] attic card attached to framing near access opening <br /> [ j notification of attic R-value and date of installation posted near building permit r„ret card <br /> This is a summary only. Other requirements may apply. See the Minnesota Energy I:udc. t)uestioim? <br /> Call the Department of Public Service Information Center at 651-296.5175 or 1-800-657-371 Ii <br /> zO 37d QNl7 QOS I29ZZL6E9L LE:ST ZOOZ/Et/tt <br />