Laserfiche WebLink
iuu.stun uulhe 0. luny twin i ..y_ _. <br /> framing together or are insulated at the time of assembly <br /> - all penetrations between conditioned and unconditioned spaces made <br /> prior to framing inspection are sealed <br /> INTERIOR AIR BARRIER <br /> - all fire stops are air sealed <br /> - pipes, ducts, wires, equipment and flues and chimneys through the interior <br /> air barrier are sealed <br /> - a sealed continuous interior air barrier is installed on the warm side of <br /> the building envelope at ceilings, walls, and floor rim joist areas* <br /> - air barrier behind tub and shower is sealed and protected <br /> - recessed light fixtures are sealed <br /> ENVELOPE INSULATION <br /> - basement insulation R-5 minimum <br /> - wind wash barrier on wall separating house and garage is sealed <br /> - loose fill insulation is prevented from entering the eaves <br /> - insulation on skylight shafts and walls exposed in attics is supported <br /> on the unconditioned side <br /> ATTIC INSULATION <br /> - attic access panel insulated to R-38 for ceiling panel and R-19 for <br /> wall panel <br /> - attic card attached to framing near access opening <br /> - notification of attic R-value and date of installation posted near build. <br /> permit inspection card <br /> This is a summary only. Other requirements may apply. See the Minnesota <br /> Energy Code. Questions? Call the Department of Public Service Information <br /> Center at 651-296-5175 or 1-800-657-3710. <br />