Laserfiche WebLink
Mr. David Klein 7 October 7, 1998 <br /> GME Project No. 7940 <br /> General Comments <br /> It is understood by all parties that the contractor is responsible <br /> for the methods and results of the work. GME will not direct the <br /> contractor' s personnel, or the construction methods used by the <br /> contractor. It is the responsibility of the contractor to protect <br /> backfill in the tested condition. GME will not warrant, assure, or <br /> guaranty the work of contractors on this project . <br /> During construction, the contractors will be solely responsible for <br /> compliance with the latest OSHA regulations for trench and slope <br /> excavation and safety, and general construction site safety. The <br /> excavator must designate one employee as the OSHA "Competent Person. " <br /> This person must be capable of identifying existing and predictable <br /> hazards on the site including temporary slope stability, and must <br /> have authorization to take prompt corrective measures to eliminate <br /> hazards . GME will not accept any responsibility or liability for <br /> construction safety on this project . <br /> The recommendations and professional opinions contained in this <br /> report are based on our understanding of the project . These opinions <br /> were arrived at in accordance with currently accepted engineering <br /> practices at this time and location. Other than this no warranty is <br /> GME CONSULTANTS,INC. <br />