My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 - P10462 - new septic system
Orono
>
Property Files
>
Street Address
>
W
>
West Farm Road
>
1770 West Farm Road - 27-118-23-44-0017
>
Septic
>
2006 - P10462 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:23:27 PM
Creation date
1/24/2020 2:26:37 PM
Metadata
Fields
Template:
x Address Old
House Number
1770
Street Name
West Farm
Street Type
Road
Address
1770 West Farm Road
Document Type
Septic
PIN
2711823440017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct. 19 06 09: 10a Josh Swedlund (952) 873-3292 p. 9 <br /> PUMP SELECTION PROCEDURE <br /> All boxed rectangles must be entered,the rest will be calculated. <br /> 1. Determine pump capacity: <br /> A. Gravity Distribution <br /> 1.Minimum required discharge is 10 gpm <br /> 2.Maximum suggested discharge is 45 gpm <br /> For other establishments at least 10%greater than the water <br /> supply rate,but no faster than the rate at which effluent will flow <br /> out of the distribution device. <br /> B. Pressure Distribution-see pressure design worksheet soli treatment system <br /> &point or discharge <br /> Selected Pump Capacity: 28.6 gpm tocol pipe <br /> lenglt I <br /> I 2A.elevation <br /> Intel r .mitis;°rrtl !,' difference <br /> 2. Determine head requirements: pipe It's{ <br /> A. Elevation difference between pump and point of discharge. t >a�1 <br /> 8 feet ii t..............W..;.:•..., <br /> B. Special head requirement?(See Figure-Special Head Requirements) <br /> 5 feet Special Head Requirements <br /> Gravity Distribution Oft <br /> C. Friction loss Pressure Distribution 5ft <br /> 1. Select pipe diameter 2 in <br /> 2. Enter Figure E-9 with gpm(1A or B)and pipe diameter(C1) Eq Frfeticin Doss In Plastic Pipe <br /> Read friction loss in feet.-r 100 feet from Figure E-9 <br /> Per 100 feet <br /> Friction loss= 1.55 ft/100 ft of pipe <br /> nominal <br /> pipe diameter <br /> 3.Determine total pipe length from pump discharge to soil system discharge point. t flew rote 1.5 2' 3' <br /> Estimate by adding 25 percent to pipe length for fitting loss, m - --� �---�-�- <br /> E.uivalent'ile length times 1.25=total pipe length 20 2,47 0,73 0.11 <br /> 40 ftx1.25= 50 feet 2`} 3.73 T.TT 0.16 <br /> 30 5,23 1.55 0,23 <br /> 4.Calculate total friction loss by multiplying friction loss(C2) 35 r 6.96 2,06 0.3:1 <br /> by the equivalent pipe length(C3)and divide by 100. 40 8.41 2,64 0,39 <br /> FL= 1.55 ft/100ft X 50 ft I 100= 0.8 feet 65 11.07 3.28 0.48 <br /> 50 13.46 3.94 0.58 <br /> D. Total head requirement is the sum of elevation difference(A),special 55 4.76 0,70 <br /> head requirements(B),and total friction loss(C4). 60 5,60 0.82 <br /> 8 ft + 5 ft + 0.8 ft 65 6.48 0,95 <br /> Total Head: 13.8 feet <br /> 3. Pump Selection <br /> 1.A pump must be selected to deliver at least 28.6 gpm(1A or B) <br /> with at least 13.8 feet of total head(20). <br /> I herLLgnature) <br /> rtify thmp) this work in accordance with all applicable ordinances,rules and laws. <br /> 74+- (license#) /0 3 (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.