My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 - Septic System approval
Orono
>
Property Files
>
Street Address
>
W
>
West Branch Road
>
4760 West Branch Road - 06-117-23-33-0002
>
Septic
>
2001 - Septic System approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:56 PM
Creation date
1/24/2020 1:41:04 PM
Metadata
Fields
Template:
x Address Old
House Number
4760
Street Name
West Branch
Street Type
Road
Address
4760 West Branch Rd
Document Type
Septic
PIN
0611723330002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm <br /> Perforation Discharges in GPM <br /> Pressure Distib ution Head Perforation diameter <br /> es <br /> 3. a. Select number of perforated laterals J (feet) 7/32`r"!' <br /> dip <br /> b. Select perforation spacing = 3 feet. to, 0.56 CP) <br /> c. Subtract 2 ft. from the rock layer length. 1.5 0.69 , I.•1 <br /> j41? t <br /> -2 ft. = YS- feet. 2.0b 0.80 1.04 <br /> d. Determine the number of spaces betweenrforations. <br /> l� a Use I.0 foot single homes. <br /> Length perf.spacing='Vie ft. + _ft. =_ILe spaces b Use 2.0 feet for anything else. <br /> e. 16/ spaces+1 = 1 7 perforations/lateral <br /> f. Multiply perforations per lateral by.,number of laterals to <br /> get total number of perforations. x w _ r = 5/ perforations. <br /> g. <br /> / x.'7 =3B' gpm. <br /> SELECTED PUMP CAPACITY 3 g gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> R feet <br /> 2. if pumping to a pressure distribution system, five feet for pressure Sod oor •rwean <br /> required at manifold if gravity system, zero. '''''.7 :1 <br /> :J feet ToU,pip.length <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. ,,,i. ii Ek.•.ennDJrae� <br /> Read friction loss in feet per 100 feet from table(F-14). P'P" c <br /> F.L. = �.6 ' ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge 4 <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length- 1.25 times pipe length= <br /> .S() x 1.25= (,t. 3 feet <br /> -c. Calculate total friction loss by multiplying Friction Loss in Plastic Pipe <br /> friction loss in ft/100 ft ay equivalent ipe length. Nominal <br /> Total friction loss= .6 x e +100= off- feet pipe dia. <br /> 4. Total head required is the sum of elevation difference, Flow Rate 1.5" 3„ <br /> special t ead requirements,and total fnchon loss. <br /> gpm <br /> + 5 + 20 2.47 0.73 0.11 <br /> 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.96 2%.. 0.30 <br /> TOTAL HEAD / 5 feet 40 8.91 X328 0.39 <br /> 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> C. Pump self ction 55 4.76 0.70 <br /> 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> 3g .gpm (Step A) with at least f feet of total head (Step B). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.