Laserfiche WebLink
• <br /> David and Wendi Albertson 5 bedroom House 4701 West Branch Rd. Orono MN <br /> Labor and Materials Dec 08 total cost to replace$308,602.99 to be complete by july 09 <br /> 5 bedroom <br /> 4 bathroom <br /> Main floor 1,692 <br /> Second floor 2,580 <br /> Total sq. ft 4,272 <br /> Attached Garage 768 <br /> Foundation & Structure =$46,883.65 <br /> Frost and Post Footings per plan and ICF block <br /> All interior flatwork per plan. (Basement floor,garage floor) <br /> All Exterior flatwork including: <br /> Front Stoop <br /> Driveway apron <br /> Front sidewalk <br /> Landscape stairs <br /> Water Proofing= $1,012.00 <br /> All below grade walls to be water proofed with a spray on sealant <br /> Provide and install interior and exterior drain file with rock bed <br /> Sump pump collection basket and pump included <br /> Rock drain field under slab <br /> Framing& Roofing=$41,069.00 <br /> All framing lumber(included Tyvek building wrap) <br /> Engineered floor and roof trusses per architectural and structural plans <br />