My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 - P10163 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
West Branch Road
>
4700 West Branch Road - 06-117-23-33-0004
>
Septic
>
2006 - P10163 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:59 PM
Creation date
1/24/2020 11:43:43 AM
Metadata
Fields
Template:
x Address Old
House Number
4700
Street Name
West Branch
Street Type
Road
Address
4700 West Branch Rd
Document Type
Septic
PIN
0611723330004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> 1. Determine pump capacity: <br /> A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> establishments at least 10%greater than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> B. Pressure distribution <br /> See pressure distribution work sheet <br /> From A or B Selected pump capacity: ,2c) gpm <br /> 2. Determine pump head requirements: <br /> A. Elevation difference between pump and point of discharge? soil treatment system <br /> feet <br /> &point of discharge <br /> orv�p <br /> B.Special head requirement? (See Figure at right-Special Head Requirements) total pipe <br /> length <br /> feet <br /> .,.a 2A.elevation <br /> inlet difference <br /> C.Calculate Friction loss pipe <br /> 1. Select pipe diameter oZ in <br /> 2. Enter Figure E-9 with gpm (1A or B) and pipe diameter(C1). ='°""- <br /> Read friction loss in feet per 100 feet from Figure E-9 Special Head Requirements <br /> Friction Loss = /•SS' ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Determine total pipe length from pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point. Estimate by adding 25 percent to pipe length for <br /> fitting loss. Total pipe length times 1.25 = equivalent pipe length E-9: Friction Loss in Plastic Pipe <br /> j feet x1.25 = 7S' feet <br /> Per 100 feet <br /> 4. Calculate total friction loss by multiplying friction loss (C2) nominal <br /> in ft/100 ft by the equivalent pipe length (C3) and divide by 100. pipe diameter <br /> = 1,55- ft/100ft x 7S� =100 = c,2 ft flow rate 1.5" 2" 3" <br /> gpm <br /> D. Total head required is the sum of elevation difference (A),special 20 2.47 0.73 0.11 <br /> head requirements (B), and total friction loss (C4) 25 3.73 1.11 0.16 <br /> ft+ ft+ of ft = 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> Total head: /.5"-- feet <br /> 40 8.91 2.64 0.39 <br /> 3. Pump selection 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.82 <br /> A pump must be selected to deliver at least aS gpm <br /> 60 5.60 0.82 <br /> (1A or B) with at least /y feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby <br /> certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> (signature) 510 _ -(license #) /O;/s s (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.