Laserfiche WebLink
NG <br /> "P l ES TI INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (763) 497-3566 <br /> CITY OF ORONO FAX (763)-497-5011 <br /> SPPTIC ER N EW State License #394 <br /> INSPECTO <br /> April 29, 2008 DAT a PERMIT NO. <br /> APPROVED AS SUBMITTED <br /> Carmen Coyle APPROVED WITH CORRECTIONS AS NOTED <br /> NOT APPROVED-CORRECT&RESUBMIT <br /> 4665 West Branch Rd. These comments are for your information. All work shall be dor. rR.ONO COPY <br /> Orono, Henn. Co., MN In full compliance with all applicable septic and zoning code. <br /> Requirements including items not specifically noted in this review, <br /> KEEP THIS PLAN SET ON SITE AT ALL TIMES <br /> This site has an existing on-site sewage treatment system which has been classified as <br /> non-compliant by the City of Orono & must be replaced by 12-31-2010. <br /> This on-site sewage treatment system is designed for a Type 1, three bedroom home, <br /> in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are a clay loam. The periodically saturated soils were located at <br /> 24" & 28" (redox features). Due to the seasonally saturated soils, a Pressurized Mound <br /> System will need to be installed to treat septic effluent. The bottom of the rock must be <br /> located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 12.0 mpi. ORONO COPY <br /> The existing tanks may be used if water tight. If not water tight, the tanks will need to <br /> be abandoned, pumped & filled with soil & 2 new 1000 gallon tanks & a 1000 gallon <br /> pumping chamber will need to be installed. An effluent screen with an alarm must be <br /> installed at the outlet of the 2nd tank. This will most likely require a new tank in order <br /> to service the screen. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> 1 THIS SYSTEM IS DESIGNED FOR <br /> ORONO COPY __,_BEDROOMS. ANY INCREASE IN NUMBER <br /> OF BEDROOMS INYAUDATES THIS DESIGN. <br />