Laserfiche WebLink
PRESSURE DISTRIBUTION SYSTEM <br /> All boxed rectangles must be entered,the rest will be calculated. <br /> 1. Select number of perforated laterals: 3 <br /> 2. Select perforation spacing= 3 ft j ...k <br /> 3. Since perforations should not be placed closer that 1 foot to <br /> the edge of the rock layer(see diagram),subtract 2 feet from <br /> the rock layer len•th <br /> 50 -2ft= 48 ft <br /> 4 Determine the number of spaces between perforations. <br /> Divide the length(3)by perforation spacing(2)and round down to nearest whole number. <br /> Perforation spacing= 48 ft/ 3 ft= 16 <br /> 5. Number of perforations is equal to one plus the number of perforation spaces(4). <br /> 'Check figure E-4 to assure the number of perforations per lateral guarantees <br /> < 10%discharge variation. <br /> 16 spaces+ 1 = 17 perforations/lateral <br /> E-4 Maximum Number of 1/4 inch perforations E-6 Perforation Discharge in GPM <br /> per lateral to guarantee<10%discharge variation Head Perforations diameter <br /> Perforation (feet) (inches) <br /> Spacing 3/16 7/32 1/4 <br /> feet 1 inch 1.25 inch 1.5 inch 2.0 inch l a 0.42 0.56 0.74 <br /> 2.5 8 14 18 28 2° 0.59 0.80 1.04 <br /> 3.0 8 13 17 26 5 0.94 1.26 1.65 <br /> • 3.3 7 12 16 25 a. Use 1.0 foot for single-family homes. <br /> 4.0 7 11 15 23 b.Use 2.0 feet for anything else <br /> l • 5.0 , 6 10 14 22 . <br /> 6. A.Total number of perforations=perforations per lateral(5)times number of laterals(1). <br /> 17 perfs/lat x 3 laterals= 51 perforations <br /> B. Calculate the square footage per perforation. <br /> Recommended value is 6-10 sgft/perf.Does not apply to at-grades. <br /> 1. Rock bed area=rock width(ft)x rock length(ft) <br /> 10 ft x 50 ft= 500 ft2 <br /> 2. Square foot per perforation=Rock Bed Area/number of perfs(6) <br /> 500.0 ft2 / 51 perfs = 9.8 ft2/pert <br /> 7. Determine required flow rate by multiplying the total number <br /> of perforations(6A)by flow per perforations(see figure E-6) <br /> 51 perfs x 0.74 gpm/perfs= 37.7 gpm <br /> 8. If laterals are connected to header pipe as shown -1-'--1_i <br /> in Figure E-1, to select minimum required lateral ,, ` <br /> _ <br /> diameter;enter figure E-4 with perforation spacing(2)and <br /> number of perforations per lateral(5). Figura E-I:LL•anMckd Locale.]at End at System <br /> Select minimum diameter for perforated laterals= 2.0 inches <br /> 9. If perforated lateral system is attached to manifold pipe agora <br /> E.2reelahnMard <br /> .. � <br /> near the center, like Figure E-2, perforated lateral length(3) <br /> and number of perforations per lateral(5)will be approximately " <br /> one half of that in step 8. Using these values,select ^ . <br /> minimum diameter for perforated lateral= 1.5 inches. • . . , <br /> • <br /> I hereby rtify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> .//) ;'11 (signature) 810 (license#) 5��� (date) <br /> :7/ Page 1 of 1 <br />