Laserfiche WebLink
. ..::;. 0 - .. <br /> .41", . <br /> (/// ® 0• <br /> ,`1 CITY of ORON .';,rr <br /> ii <br /> IA . J Municipal Offices <br /> 'r` l; 4 : <br /> Street Address: Mailing Address: <br /> 4-klEs de. 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address p D F .S -)e Oa eCi ' a <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Nos / <br /> No t.,,,,/ <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identifi as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought i ompliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> . The tank(s) should be cleaned though the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: e- '.-A-e, r.-i- .7-c3 e -t-y S&J cr <br /> aE; a6,,� `'11;; '` �r ' <br /> ,.., t„-t^.� 5'�. .:- /6.---: <br /> Inspector: Date of Inspection ( _ 0 C <br /> Telephone (952) 249-4600 o F2.N !952 249-415'16 <br /> N'vw,,,,.ci.o Cato. n.us <br />