My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-21-2020 Planning Commission Packet
Orono
>
Planning Commission
>
2020
>
01-21-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:59:09 PM
Creation date
1/22/2020 9:41:44 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, November 18, 2019 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 33 of 46 <br /> <br />Ressler stated the total lot structure is 2,000 feet. <br /> <br />Thiesse said they are at 1,817. The hardcover is the struggle, and they reduced it. <br /> <br />Gettman commented the applicant already has it and they're moving it. <br /> <br />Ressler stated he can appreciate that. The proposal is 1,817. They're going up from 1,771, which is not a <br />great amount. <br /> <br />Gettman noted he is not opposed to it. <br /> <br />Erickson said, given the constraints of the lot and the uniqueness of its location and the applicant's <br />willingness to reduce the hardcover, it is worthy of his support. <br /> <br />Ressler clarified his initial concern and said it is not exceeding the allowable structure, so that seems <br />reasonable to him. <br /> <br />Libby moved, Bollis seconded, acceptance of Application LA19-000094, David Burda, 1966 <br />Shadywood Road, Variances. VOTE: Ayes 7, Nays 0. <br /> <br />10. LA19-000095 JOHN QUINLIVAN, 2927 CASCO POINT ROAD, VARIANCES, <br />9:45 P.M. - 9:54 P.M. <br /> <br />John Quinlivan, Gordon James Construction, was present. <br /> <br />Oakden presented a summary of packet memorandum. <br /> <br />Ressler stated it would be improving the condition. <br /> <br />Oakden agreed that it would be improving the condition and said the applicant is also requesting an IUP <br />for hauling roughly 600 cubic yards of material to and from the site during construction. Staff finds, due <br />to the nature of the lot and the applied setbacks, there are practical difficulties supporting granting the lot <br />width variance, average lakeshore setback variance, and IUP for construction of a new home. No public <br />comment has been received on the application and Staff recommends approval. <br /> <br />Mr. John Quinlivan, Gordon James Construction, 5159 Main Street, Maple Plain, said he got a letter from <br />the adjacent property owner to the south and the property owner to the north sent an email. If the <br />Commissioners had a wider look at the property, it shows there's approximately 12 properties all at the <br />same distance. There's one property that is set back. The house that is set back is coming down. They <br />have talked to the City about condemning the house because it is in terrible shape. They’re conforming to <br />side yard setbacks; they're conforming to the rear yard. If the house next door was down, the
The URL can be used to link to this page
Your browser does not support the video tag.