Laserfiche WebLink
Proposed <br /> Unless included as part of a permtted project, a separate Land Alteration permit is <br /> required for the following activities: <br /> Location ACTIVITY <br /> Lake Yard or Shore Activity in the All other areas <br /> Setback Zone Shoreland Overlay <br /> District, but outside <br /> the Lake Yard <br /> Grading Up to 10 Cubic Yards More than 50 CY or More than 50 CY or <br /> or 1000 sq ft or disturbing more than disturbing more than <br /> Grading of any 5,000 sq ft 5,000 sq ft <br /> amount intended to <br /> address a slope failure <br /> Import/Export Between 10 CY and up Between 50 and 500 Between 50 and 1000 <br /> to 500 CY CY CY <br /> Stockpiling Up to 90 days Up to 180 days Up to 180 days <br /> Interium Use Permit is required if the following activitys are NOT included in a permitted <br /> project <br /> Activity Location <br /> Grading 10 or More Cubic More than 50 Cubic More than 50 Cubic <br /> Import/Export More than 500 CY More than 500 CY More than 1000 CY <br /> Stockpiling Stockpiling more than Stockpiling more than Stockpiling more than <br /> 90 days 180 days 180 days <br /> No permit is required for the following activities <br /> Grading Less than 10 CY or Less than 50 CY or Less than 50 CY or <br /> disturbing less than disturbing less than disturbing less than <br /> 1000 sq ft 5,000 sf 5,000 sf <br /> Import/Export Less than 10 CY Less than 50 CY Less than 50 CY <br /> Stockpiling Less than 14 days Less than 14 days Less than 14 days <br />