My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993 - Septic System info
Orono
>
Property Files
>
Street Address
>
W
>
Webber Hills Road
>
2000 Webber Hills Rd - 03-117-23-34-0017
>
Septic
>
1993 - Septic System info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:37:38 PM
Creation date
1/22/2020 9:27:58 AM
Metadata
Fields
Template:
x Address Old
House Number
2000
Street Name
Webber Hills
Street Type
Road
Address
2000 Webber Hills Rd
Document Type
Septic
PIN
0311723340017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
END PERFORATION OF A PERFORATED LATERAL <br /> PRESSURE DISTRIBUTION SYSTEM <br /> Grow cover <br /> ,c ,_ r <br /> w <br /> .1 ` ToDsoll <br /> .vv <br /> 1. Select number of perforated laterals <br /> Layer of Geote:rile Fabric (or four- <br /> ... Loamy Sand Layer inch toyer of hay or straw covered <br /> with red rosin paper) <br /> 2. Select perforation spacing = 2 r'D feet R . 'a I Perforation Grilled Horizontally <br /> t •• c.I Into COD Near Top <br /> a ,` At Least 12�to Edge <br /> v r Plus <br /> Oroln Field Rocko .7.4.'4. of Rock Layer <br /> 3. Since perforations should not be placed closer than 1 ft. to • • �'_P�rIarallon,Located at <br /> the edge of the rock layer (see diagram), subtract 2 ft. from Clean Sand Layer Bottom of Lateral <br /> the rock layer length. <br /> 4.Original Soil Properly Scarified <br /> 5C <br /> /� Before Placing Sand Layer <br /> Rock layer length - 2 ft. = �i S feet <br /> TABLE OF PERFORATION DISCHARGES IN GPM <br /> 4. Determine the number of spaces between perforations. Head Perforation diameter(inches) <br /> Divide the length above by perforation spacing and round <br /> down to nearest whole number. y/n t/' . <br /> 1.0a 0.56 0.74 <br /> Length perf. spacing = `)c ft. - 25 ft. = ri spaces 1.5 0.69 0.90 <br /> 2.0b 0.80 1.04 <br /> (#3) (#2) 2.5 0.89 1.17 <br /> 5. Number ofperforations is equal to oneplus the number of 3.0 0.98 1.28 <br /> q 4.0 1.13 1.47 <br /> perforation spaces . 5.0 1.26 1.65 <br /> aUse 1.0 foot of head for residential systems. <br /> 1S spaces + 1 = 20 perforations per lateral bUse 2.0 feet of head for other establishments <br /> 6. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. <br /> --� "� Table 2 <br /> 3 �.eJ _ Maximum allowable number of quater inch perforations per <br /> laterals x perfs/lateral �� perforations lateral to guarantee<10%Discharge variation <br /> arfer•(��;)"ch4I 1.25 inch 1.5 inch I 2.0 inch <br /> 7. Determine required flow rate by multiplying 2.5 14 18 28 <br /> number of perforations by flow per perforation 3.0 13 17 26 <br /> 3.3 12 16 25 <br /> 4.0 11 15 23 <br /> rte, O _ 5.0 10 I 14 22 <br /> perfs x gpm/pert - gpm. <br /> sY+✓0.o LOWED at•CNr or Memwe MT.efl TTX. <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example, select minimum required lateral diameter from -m. <br /> table 2; enter table with perforation spacing and number _____ <br /> of perforations per lateral. Select minimum diameter for �. "f ,�.. <br /> perforated lateral = inches ✓,,..--- u- <br /> \/ <br /> 9. If perforated lateral system is attached to manifold pipe near <br /> the center, as in lower example, perforated lateral length and <br /> number of perforations per lateral will be approximately one 9, """"' <br /> ~� <br /> half of that in #6. Using these values, select minimum 3z.r.,r 1• " <br /> diameter for perforated lateral from table 2 R--- <br /> perforated lateral = 2. inches <br /> l\w\ � ,mer, . <br /> yam', <br />
The URL can be used to link to this page
Your browser does not support the video tag.