Laserfiche WebLink
PERFORATED <br /> ,,r._• <br /> ., LATERALS <br /> • ;- <br /> SANDY LOAM SOIL - <br /> -. '• <br /> LAYER OF STRAW OR • %/� ''!• / / •. <br /> • <br /> MARSH HAY COVERED ,% i f' �'� • !• <br /> :�;�.: _ . . . . <br /> . WITH. RED ROSIN PAPER �- r <br /> r /• <br /> • . I '/2 OR 2" Y:.l.:..' �. %/ ��- / <br /> PIPE fRQM RUMP �`:'�. //..�/„7 i r - • . <br /> i' II /' <br /> 3� „ _ 2 ,� ” _ /DIVERSION <br /> CLAN ROCK �• '•.�j ' FOR <br /> �_ SURFACE WATER <br /> 6” TOPS SO I L� ' % _ '' / /� �,/ '1. REMOOVVE EXCESS VEGETATION.PLOWAS LEVEL A STE AS .POSSIBLE FOR USING OR THE NBACKHOE RAKER TEETH. <br /> • / DO THIS ONLY IF THE MOISTURE <br /> / i - ! ROUGHEN THE SURFACE SOIL 6 PLASTIC <br /> LIMIT <br /> ' / / / CONTENT 15 U35 THAN THE PLASTIC LIMIT(SOIL 15 PLASTIC IF IT CAN BE ROILED <br /> ♦. a, / y INTO AN Ye INCH WIRE).DO NOT REMOVE ANY OF THE SURFACE SOIL. MOUND <br /> • <br /> •,,..• . J st ; PERFORMANCE ON CLAY SOIL DEPENDS ON EXTREME CARE TO PREVENT COMPACTION <br /> • . / / AND PUDDLING OF THE CLAY DURING CONSTRUCTION. DO NOT USE HEAVY CONSTRUC- <br /> �"tK,,��•� ••;�. 2,- ,:1' / / S / W A�PUIIAST C CONDITION. CONSTRUCT THE MOUND WHEN THE CLAY SOIL IS <br /> �1 V.:3. USE ONLY TRACK-TYPE EOIAPMENT FOR CONSTRUCTING THE MOUND SO AS NOT <br /> • -• :- `' -_ /' TO COMPACT THE aRIGMtAL SOIL. <br /> •--___ <br /> r , ; , MAX/ -` . `. 4. THERE MUST BE AT LEAST 2 FEET OF NATURAL OR FILL SOIL HAVING A PERGOLA <br /> _ 1 I ',r: TION RATE NO SLOWER THAN 120 MINUTES PER INCH AND NO FASTER THIN 5 <br /> ' - 3 •`;:• ``y - '• . MINUTES PER INCH.BEFORE PLACING THE LAYER OF CLEAN SAND <br /> *• f:...••? 5 THE 12 INCH LAYER OF CLEAN SANK IS PART OF THE MgUND CONSTRUCTION SAND <br /> /p >� 4 • • i'_. ti' IS CONSIDERED CLEAN f IT CAN PASS THE"FRUIT JAR TEST FOR CONCRETE SAND. <br /> LEACop • <br /> �� • '::�,•-, .�':i. 6. THE TOP OF THE CLEAN SAND LAYER AND THE TOP OF THE ROCK BED MET BE <br /> s.•;• <br /> 1 ` ' �� ..yj,• j:.�.. .'• CONSTRUCTED LEVEL. <br /> SAID N� O' �``� 4- 36'. -.`.'^14i";•`•:.'.•i: 7. DISTRIBUTION PIPES ARE II/2-INCH DIAMETER SPACED 40 INCHES ON CENTER <br /> v N ••••...0.- PND CONNECTED TOA MANIFOLD IN THE CENTER OF THE ROCK BED- PIPES HAVE <br /> •' `~ !.• .: / INCH FER:FORStTIONSDRLLED EVERY36INCHEAND POINTING DOWNWARD.Q RO AYE � •ti. 'c •• l ANEBITTDOID BURRSINSIDE THPIPE.KEN R' ' : •".':8. NINE INCROC)c ARE PLACED UNDER THE PERFORATED LATERALS AND 2 <br /> f -� INCHES ABOVE FOR A TOTAL ROCK DEPTH OF 12 INCHES. <br /> 9. THE ROCK IS FIRST COVERED WITH A LAYER OF WAY OR STRAW WHICH b THEN <br /> TI ' . COVERED WITH A LAYER OF RED ROSIN PAPER LAPPED 6 INCHES AT THE SEAMS. <br /> • <br /> gA RN ATUR <br /> Rq 10. ATAOCLEASTBEE INCHES OF LOAMY SAND SHOULD BE PLACED OVER THE TOP OF THE <br /> ii I R LAyE. II. A 6-INCH LAYER OF TOP SOIL SHOULD BE PLACED OVER THE ENTIRE MOUND SO <br /> a1 T f, THAT A CRASS COVER CAN BE ESTABUSHED. <br /> �I2 CROWN THE SOIL ABOVE THE ROCK LAYER SO TR AT HAT <br /> HATTHEAVY RAIAINNWILL ERUN CENTER THE MOUND <br /> 13. SIDE SLOPES OF THE DIKES SHOULD BE NO STEEPER THAN 4,1 ON CLAY SOILS <br /> AND 3,1 ON SANDY SOILS. <br /> t4. D -LAYER.DEPENDS ON THE AMOUNT.OF DAILY <br /> SE f). <br /> 15. MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NO MORE THE TABLE <br /> VALUES. <br /> 16. MINIMUM PUMPING RATE IS SHOWN IN TABLE. PUMPING HEAD MUST BE <br /> ADEQUATE TO OVERCOMEELEVATION DIFFERENCE, FRICTION LOSS PLUS 5 FEET <br />