My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008 - Soil & Percolation Testing
Orono
>
Property Files
>
Street Address
>
W
>
Wear Lane
>
70 Wear La - 04-117-23-21-0019
>
Septic
>
2008 - Soil & Percolation Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:52 PM
Creation date
1/21/2020 9:33:57 AM
Metadata
Fields
Template:
x Address Old
House Number
70
Street Name
Wear
Street Type
Lane
Address
70 Wear La
Document Type
Septic
PIN
0411723210019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Calculate Clean Sand Lift: 3 feet minus Depth to Limiting Layer (1.C)= Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.0 ft= 2.0 ft <br /> B. Calculate Upslope Height: Clean Sand Lift (4.A) +media depth (1 ft.) + cover (1 ft.)= Upslope Height <br /> 2.0 ft + 1.0 ft+ 1.0 ft= 4.0 ft <br /> C. Select Upslope Berm Multiplier <br /> (based on land slope): 3.57 (figure D-34) <br /> D. Calculate Upslope Berm Width: Multiplier (4.C)X Upslope Mound Height (4.B)= Upslope Berm Width <br /> 3.57 x 4.0 ft = 14.0 ft <br /> E. Calculate Drop in Elevation Under Media:Media Width (2.B) X Land Slope(1.E) : 100=Drop (ft) <br /> 10.0 x 3.0 %= 100= 0.3 ft <br /> F. Calculate Downslope Mound Height: Upslope Height (4.B) +Drop in Elevation (4.E) =Downslope Height <br /> 4.0 ft + 0.3 ft= 4.3 ft <br /> Select Downslope Berm Multiplier <br /> G. (based on land slope): 4.54 (figure D-34) <br /> H. Calculate Downslope Berm Width:Multiplier (4.G)X Downslope Height (4.F) =Downslope Berm Width <br /> 4.54 x 4.3 ft = 19.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width (3.B or 3.C)+4 ft. =ft <br /> 10.0 ft+ 4 ft= 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 19.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F) =Endslope Berm Width <br /> 3.00 x 4.3 ft= 14.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width(4.D) +Media Width (2.B) +Downslope Berm Width (4.J)=ft <br /> 14.0 ft + 10.0 ft+ 19.0 ft = 43.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width (4.L) +Media Length (2.C) +Endslope Berm Width (4.L) =ft <br /> 14.0 ft+ 50.0 ft+ 14.0 ft= 78.0 ft <br /> D-34:Scope Multiplier Table <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 <br /> Upslope 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 2.17 2.13 2.09 2.06 2.03 2.00 1.97 1.95 1.93 1.91 1.89 1.87 1.85 <br /> Berm Ratio 4:1y4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 2.62 2.55 2.48 2.41 2.35 2.29 2.23 2.18 2.13 2.08 2.03 1.98 1.93 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 4.95 5.24 5.55 5.88 6.24 6.63 7.04 7.47 7.93 8.42 8.93 9.46 10.02 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88_6.25 6.67 7.14 7.69 8.29 8.92 9.57 10.24 10.94 11.67 12.42 13.19 13.99 14.82 15.67 16.54 17.44 <br /> 5. ORGANIC LOADING: (if pretreatment is being used) <br /> A. Organic Loading = Design Flow X Estimated BOD in mg/L in the effluent X 8.35 : 1,000,000(See Table III) <br /> gpd X mg/L X 8.35 : 1,000,000 = lbs BOD/day <br /> B. Calculate System Organic Loadin : lbs. BOD (5.A) T Media Area (2.A) = lbs/day/ft2 <br /> lbs/day ft2 = lbs/day/ft2 <br /> Table III (7083.4030) <br /> BOD Treatment BOD (mg/L) <br /> Level A 15 <br /> Level B 25 <br /> Level C 125 <br /> 6. MOUND DIMENSIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.